How to Add Sub-Feed Output Distribution Circuit Breakers to the ATS

Circuit breaker adapter modules available from APC

Adapter modules are required when mounting breakers onto the panel bus in the ATS. Each adapter module can accommodate two breakers.

APC’s adapter modules are sized to fit all of the circuit breaker types described on the previous page: T1 single-pole breakers, T1 three-pole breakers, and T3 three-pole breakers. Two types of T1 single- pole adapters are offered: one that plugs into either L1 or L3, and one that plugs into L2. When adding single-pole breakers, try to keep the loads balanced among L1, L2, and L3.

PGT11PADAP

T1 single-pole adapter module for plugging into L1 or L3

PGT1L21PADAP

T1 single-pole adapter module for plugging into L2

PGT13PADAP

T1 three-pole adapter module

PGT33PADAP

T3 three-pole adapter module

 

 

Determine the configuration of the panel

Before installing circuit breakers on the ATS panel bus, be sure enough space is available on the bus. Use the information below and in the next section to determine configurations.

ABB T1 single-pole breakers

T1 single-pole adapter Amount of space available

module

on the 250A ATS

 

Distribution Panel Bus

ABB T1 three-pole breakers

T1 three-pole adapter

module

ABB T3 three-pole breakers

T3 three-pole adapter

module

InfraStruXure Power Generation System

69

Image 79
Contents Operation Page Companion manuals How to find updates to this manualAbout This Manual AudiencePage Contents Display Interface Communication Configuration Customizing and Updating the ATS Specifications Page Cross-reference symbols used in this manual Safety symbols used in this manualOverview Wire sizing Total power off procedure InstallationOperating environment Page Overview InfraStruXure Power Generation SystemSystem Operates How the InfraStruXure Power GenerationGenerator cool-down Generator start sequenceOpen and closed transfers Fuel monitoring/runtime calculation Page Front view, door closed Smart Distribution Panel with ATS The automatic operation Control panel is used to set Front view, door openATS panel board, left side Installation Manual for instructionsATS panel board, right side ATS Component Details Motorized switchesUser connection plate Automatic operation control panelATS monitoring unit  When the EPO Arm/Test rocker is in the TestATS label kit Automatic Operation OperationAutomatic Operation Problem-loss of automatic operation Emergency Manual Operation Set the ATS Automatic Operation switch to Disable How to power the load from the generatorEmergency Manual Operation How to return to powering the load from utility Press Total Power Off Total Power Off Display Interface Top-level menu screen Top-level status screensNavigating through screens Password-protected screensTotal Load Summary Total Load by PhasePower Factor Load-MeterATS Position ATS/VoltageS1-Utility S2-Generator ATS Setup ATS/Voltage Generator Status GeneratorGen Output Adjust Operating SettingsManufacturer Data View Test Log TestingRun/View Test Test Duration Test ScheduleHow a test occurs Reset All ResetStats Alarm Setup AlarmsView Active Alarms Alarm/Event LogOther Limits Alarm BeeperClearing latched alarms Fuel Alarm LimitsDate/Time ConfigSystem Password System/NetworkPage Reset 100% Fuel Level Electrical ConfigFactory Defaults Firmware UpdatesPage Network management interfaces ATS Management OptionsOverview InfraStruXure ManagerConnect the ATS to the InfraStruXure Manager Configuring the InfraStruXure ManagerConnect the ATS to your network Configuring the ATS Network Management InterfaceTCP/IP configuration methods Configuration overviewDevice IP Configuration Wizard Bootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Remote access to the control console Local access to the control consoleChoose Network from the Control Console menu Control consoleWeb interface How to Access the ATS Network Management InterfaceSnmp Telnet and SSHFTP and SCP InfraStruXure Power Generation System Customizing and Updating the ATS How to connect contacts to the user interface board EPO Test NC no How to Connect an EPO Switch to the ATSContact Closure-Normally Open Problem Action Safety warnings How to Allow Easy Access to the ATS Display Interface Part Number Description Height on Panel Output distribution circuit breakers available from APCCircuit breaker adapter modules available from APC Determine the configuration of the panelCombination #1 Allowed circuit breaker combinationsCombination #6 T1 three-pole breaker requires no additional preparation Preparing the breakers for installationT1 three-pole breaker assembly Parts and tools needed for installation proceduresInstalling breakers on the ATS panel bus See also From a local computer How to Download Firmware UpdatesPhysical ElectricalAWG Installation and Wiring 208V 480VCompliance EnvironmentalPage If Source 2 is a Second Utility Appendix Custom InstallationsInfraStruXure Power Generation System Index InfraStruXure Power Generation System InfraStruXure Power Generation System Page Page Page Radio Frequency Interference 990-1845C