Page 52

Stats

Statistics: 00 of 00

Name of statistic here

XX,XXXX

Reset

Reset All

Scroll through a list of items that accumulates after the statistics record is reset, including:

Open Xfer Count: The number of open transfers since this statistic was reset.

Closed Xfer Count: The number of closed transfers since this statistic was reset.

Generator Fuel Used: The amount of fuel used since this statistic was reset.

Source 1 Bad Count: The number of times Source 1 was not acceptable, as defined in the Transfer Points menu, since this statistic was reset.

S1 Low Volts Count: The number of times the Source 1 input voltage went below the configured Low voltage Transfer Point on one or more of the phases since this statistic was reset.

S1 High Volts Count: The number of times the Source 1 input voltage exceeded the configured High voltage Transfer Point on one or more of the phases since this statistic was reset.

S1 Bad Freq Count: The number of times the Source 1 input voltage went outside the configured Freq range, as defined in the Transfer Points menu, since this statistic was reset.

S1 Imbalance Count: The number of times the percent voltage difference between two phases, as defined by the Phase Balance setting in the Transfer Points menu, was exceeded on Source 1 since this statistic was reset.

Total Time S1 Bad: The total amount of time Source 1 was not acceptable, as defined in the Transfer Points menu, since this statistic was reset.

Maximum Time S1 Bad: The longest amount of time Source 1 was not acceptable, as defined in the Transfer Points menu, since this statistic was reset.

Minimum Time S1 Bad: The shortest amount of time Source 1 was not

 

acceptable, as defined in the Transfer Points menu, since this statistic was reset.

 

Time on Source 1: The total amount of time Source 1 was selected since this

 

statistic was reset.

 

Time on Source 2: The total amount of time Source 2 was selected since this

 

statistic was reset.

Reset

Reset only the statistic that is shown on the screen by pressing ENTER and

 

following the prompts.

Reset All

Reset all of the statistics by pressing ENTER and following the prompts.

42

InfraStruXure Power Generation System

Image 52
Contents Operation Page How to find updates to this manual About This ManualAudience Companion manualsPage Contents Display Interface Communication Configuration Customizing and Updating the ATS Specifications Page Cross-reference symbols used in this manual Safety symbols used in this manualOverview Wire sizing Total power off procedure InstallationOperating environment Page InfraStruXure Power Generation System OverviewHow the InfraStruXure Power Generation System OperatesGenerator start sequence Generator cool-downOpen and closed transfers Fuel monitoring/runtime calculation Page Smart Distribution Panel with ATS Front view, door closedFront view, door open  The automatic operation Control panel is used to setInstallation Manual for instructions ATS panel board, left sideATS panel board, right side Motorized switches ATS Component DetailsAutomatic operation control panel User connection plate When the EPO Arm/Test rocker is in the Test ATS monitoring unitATS label kit Operation Automatic OperationAutomatic Operation Problem-loss of automatic operation Emergency Manual Operation How to power the load from the generator Set the ATS Automatic Operation switch to DisableEmergency Manual Operation How to return to powering the load from utility Press Total Power Off Total Power Off Display Interface Top-level status screens Top-level menu screenPassword-protected screens Navigating through screensTotal Load by Phase Power FactorLoad-Meter Total Load SummaryATS Position ATS/VoltageS1-Utility S2-Generator ATS Setup ATS/Voltage Generator Generator StatusGen Output Adjust Operating SettingsManufacturer Data View Test Log TestingRun/View Test Test Schedule Test DurationHow a test occurs Reset All ResetStats Alarms View Active AlarmsAlarm/Event Log Alarm SetupAlarm Beeper Clearing latched alarmsFuel Alarm Limits Other LimitsConfig System PasswordSystem/Network Date/TimePage Electrical Config Factory DefaultsFirmware Updates Reset 100% Fuel LevelPage ATS Management Options OverviewInfraStruXure Manager Network management interfacesConfiguring the InfraStruXure Manager Connect the ATS to the InfraStruXure ManagerConfiguring the ATS Network Management Interface Connect the ATS to your networkTCP/IP configuration methods Configuration overviewDevice IP Configuration Wizard Bootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Local access to the control console Remote access to the control consoleControl console Choose Network from the Control Console menuHow to Access the ATS Network Management Interface Web interfaceTelnet and SSH SnmpFTP and SCP InfraStruXure Power Generation System Customizing and Updating the ATS How to connect contacts to the user interface board How to Connect an EPO Switch to the ATS EPO Test NC noContact Closure-Normally Open Problem Action Safety warnings How to Allow Easy Access to the ATS Display Interface Output distribution circuit breakers available from APC Part Number Description Height on PanelDetermine the configuration of the panel Circuit breaker adapter modules available from APCAllowed circuit breaker combinations Combination #1Combination #6 Preparing the breakers for installation T1 three-pole breaker requires no additional preparationParts and tools needed for installation procedures T1 three-pole breaker assemblyInstalling breakers on the ATS panel bus See also How to Download Firmware Updates From a local computerElectrical PhysicalInstallation and Wiring 208V 480V AWGEnvironmental CompliancePage Appendix Custom Installations If Source 2 is a Second UtilityInfraStruXure Power Generation System Index InfraStruXure Power Generation System InfraStruXure Power Generation System Page Page Page Radio Frequency Interference 990-1845C