Configuring the InfraStruXure Manager

Connect the ATS to the InfraStruXure Manager

1.Connect a CAT-5 network cable to the surge-protected ethernet port on the user connection plate. The arrow in the illustration below is pointing to the port. The figure on page 11 shows the location of the user connection plate on the roof of the ATS.

You can make this connection from inside the enclosure, or you can remove the user connection plate from the ATS to make the connection. A Phillips or standard screwdriver is needed to loosen the two captive screws. Use the knockout in this plate to route the cable. If you decide to remove the plate, make sure not to disturb the existing connections.

2.Run the connected CAT-5 network cable through the

knockout in the user connection plate to the InfraStruXure Manager Hub.

3.Configure the InfraStruXure Manager only after all APC InfraStruXure-Certified equipment has been installed, the network cable has been connected to the InfraStruXure Manager Hub, and start-up of the system has been completed.

For detailed configuration instructions, refer to the Installation and Quick-Start Manual included with your InfraStruXure Manager.

See also

50

InfraStruXure Power Generation System

Image 60
Contents Operation Page How to find updates to this manual About This ManualAudience Companion manualsPage Contents Display Interface Communication Configuration Customizing and Updating the ATS Specifications Page Safety symbols used in this manual Cross-reference symbols used in this manualOverview Wire sizing Installation Total power off procedureOperating environment Page InfraStruXure Power Generation System OverviewHow the InfraStruXure Power Generation System OperatesGenerator start sequence Generator cool-downOpen and closed transfers Fuel monitoring/runtime calculation Page Smart Distribution Panel with ATS Front view, door closedFront view, door open  The automatic operation Control panel is used to setInstallation Manual for instructions ATS panel board, left sideATS panel board, right side Motorized switches ATS Component DetailsAutomatic operation control panel User connection plate When the EPO Arm/Test rocker is in the Test ATS monitoring unitATS label kit Operation Automatic OperationAutomatic Operation Problem-loss of automatic operation Emergency Manual Operation How to power the load from the generator Set the ATS Automatic Operation switch to DisableEmergency Manual Operation How to return to powering the load from utility Press Total Power Off Total Power Off Display Interface Top-level status screens Top-level menu screenPassword-protected screens Navigating through screensTotal Load by Phase Power FactorLoad-Meter Total Load SummaryATS/Voltage ATS PositionS1-Utility S2-Generator ATS Setup ATS/Voltage Generator Generator StatusOperating Settings Gen Output AdjustManufacturer Data Testing View Test LogRun/View Test Test Schedule Test DurationHow a test occurs Reset Reset AllStats Alarms View Active AlarmsAlarm/Event Log Alarm SetupAlarm Beeper Clearing latched alarmsFuel Alarm Limits Other LimitsConfig System PasswordSystem/Network Date/TimePage Electrical Config Factory DefaultsFirmware Updates Reset 100% Fuel LevelPage ATS Management Options OverviewInfraStruXure Manager Network management interfacesConfiguring the InfraStruXure Manager Connect the ATS to the InfraStruXure ManagerConfiguring the ATS Network Management Interface Connect the ATS to your networkConfiguration overview TCP/IP configuration methodsDevice IP Configuration Wizard Bootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Local access to the control console Remote access to the control consoleControl console Choose Network from the Control Console menuHow to Access the ATS Network Management Interface Web interfaceTelnet and SSH SnmpFTP and SCP InfraStruXure Power Generation System Customizing and Updating the ATS How to connect contacts to the user interface board How to Connect an EPO Switch to the ATS EPO Test NC noContact Closure-Normally Open Problem Action Safety warnings How to Allow Easy Access to the ATS Display Interface Output distribution circuit breakers available from APC Part Number Description Height on PanelDetermine the configuration of the panel Circuit breaker adapter modules available from APCAllowed circuit breaker combinations Combination #1Combination #6 Preparing the breakers for installation T1 three-pole breaker requires no additional preparationParts and tools needed for installation procedures T1 three-pole breaker assemblyInstalling breakers on the ATS panel bus See also How to Download Firmware Updates From a local computerElectrical PhysicalInstallation and Wiring 208V 480V AWGEnvironmental CompliancePage Appendix Custom Installations If Source 2 is a Second UtilityInfraStruXure Power Generation System Index InfraStruXure Power Generation System InfraStruXure Power Generation System Page Page Page Radio Frequency Interference 990-1845C