American Power Conversion 250 A manual Problem Action

Page 75

How to Connect an EPO Switch to the ATS

3.Test the EPO switch to ensure it is wired properly and working correctly:

a.Place the Arm/Test rocker switch on the ATS monitoring unit in the Test position. The EPO state LEDs should be off and the ATS display interface should show the following alarm (in addition to any other active alarms):

Active Alarm xxofxx

EPO Ready To Test

b.Engage the EPO switch (if your switch is momentary, engage while one person is watching the EPO state LEDs and another is at the EPO switch).

c.Observe the EPO LEDs. If the switch is wired properly and working correctly, both of the EPO state LEDs should light red when the switch is engaged.

d.If the test was successful, return the Arm/Test rocker switch to the Arm position. The ATS display interface will clear the EPO test mode alarm. If the test was not successful, refer to the following troubleshooting chart:

Problem

Action

Neither state LED was lit red

• Check the wiring to your EPO switch.

when the EPO switch was

• Check to make sure the EPO DIP switch

engaged.

configuration is correct for your switch

 

 

(NO or NC). See step 2 on the previous page for

 

proper configuration instructions.

 

 

Only one of the state LEDs was lit

• Check to make sure the EPO DIP switch

red when the EPO switch was

configuration is correct for your switch

engaged.

(NO or NC) and retest. See step 2 on the

 

previous page for proper configuration

 

instructions.

If the switch is configured correctly and both LEDs did not light red after retesting, contact APC customer support (see the back cover of this manual).

e.Repeat this test for each EPO switch installed.

4.After testing is completed, ensure the Arm/Test rocker switch is in the Arm position on the ATS monitoring unit.

InfraStruXure Power Generation System

65

Image 75
Contents Operation Page Companion manuals How to find updates to this manualAbout This Manual AudiencePage Contents Display Interface Communication Configuration Customizing and Updating the ATS Specifications Page Safety symbols used in this manual Cross-reference symbols used in this manualOverview Wire sizing Installation Total power off procedureOperating environment Page Overview InfraStruXure Power Generation SystemSystem Operates How the InfraStruXure Power GenerationGenerator cool-down Generator start sequenceOpen and closed transfers Fuel monitoring/runtime calculation Page Front view, door closed Smart Distribution Panel with ATS The automatic operation Control panel is used to set Front view, door openATS panel board, left side Installation Manual for instructionsATS panel board, right side ATS Component Details Motorized switchesUser connection plate Automatic operation control panelATS monitoring unit  When the EPO Arm/Test rocker is in the TestATS label kit Automatic Operation OperationAutomatic Operation Problem-loss of automatic operation Emergency Manual Operation Set the ATS Automatic Operation switch to Disable How to power the load from the generatorEmergency Manual Operation How to return to powering the load from utility Press Total Power Off Total Power Off Display Interface Top-level menu screen Top-level status screensNavigating through screens Password-protected screensTotal Load Summary Total Load by PhasePower Factor Load-MeterATS/Voltage ATS PositionS1-Utility S2-Generator ATS Setup ATS/Voltage Generator Status GeneratorOperating Settings Gen Output AdjustManufacturer Data Testing View Test LogRun/View Test Test Duration Test ScheduleHow a test occurs Reset Reset AllStats Alarm Setup AlarmsView Active Alarms Alarm/Event LogOther Limits Alarm BeeperClearing latched alarms Fuel Alarm LimitsDate/Time ConfigSystem Password System/NetworkPage Reset 100% Fuel Level Electrical ConfigFactory Defaults Firmware UpdatesPage Network management interfaces ATS Management OptionsOverview InfraStruXure ManagerConnect the ATS to the InfraStruXure Manager Configuring the InfraStruXure ManagerConnect the ATS to your network Configuring the ATS Network Management InterfaceConfiguration overview TCP/IP configuration methodsDevice IP Configuration Wizard Bootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Remote access to the control console Local access to the control consoleChoose Network from the Control Console menu Control consoleWeb interface How to Access the ATS Network Management InterfaceSnmp Telnet and SSHFTP and SCP InfraStruXure Power Generation System Customizing and Updating the ATS How to connect contacts to the user interface board EPO Test NC no How to Connect an EPO Switch to the ATSContact Closure-Normally Open Problem Action Safety warnings How to Allow Easy Access to the ATS Display Interface Part Number Description Height on Panel Output distribution circuit breakers available from APCCircuit breaker adapter modules available from APC Determine the configuration of the panelCombination #1 Allowed circuit breaker combinationsCombination #6 T1 three-pole breaker requires no additional preparation Preparing the breakers for installationT1 three-pole breaker assembly Parts and tools needed for installation proceduresInstalling breakers on the ATS panel bus See also From a local computer How to Download Firmware UpdatesPhysical ElectricalAWG Installation and Wiring 208V 480VCompliance EnvironmentalPage If Source 2 is a Second Utility Appendix Custom InstallationsInfraStruXure Power Generation System Index InfraStruXure Power Generation System InfraStruXure Power Generation System Page Page Page Radio Frequency Interference 990-1845C