Installation Requirements - Commonwealth of Massachusetts

Commonwealth of Massachusetts

For all side wall terminated, horizontally vented power vent, direct vent, and power direct vent gas fueled water heaters installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:

INSTALLATION OF CARBON MONOXIDE DETECTORS

At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the sidewall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors.

In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.

In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements provided that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.

APPROVED CARBON MONOXIDE DETECTORS

Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/ UL 2034 listed and CSA certified.

SIGNAGE

A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one- half (1/2) inch in size, “gas vent directly below. Keep clear of all obstructions.”

Inspection

The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a) 1 through 4.

EXEMPTIONS

The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4:

1.The equipment listed in Chapter 10 entitled “Equipment Not Required To Be Vented” in the most current edition of NFPA 54 as adopted by the Board; and

2.Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building, or structure used in whole or in part for residential purposes.

MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM PROVIDED

When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:

1.Detailed instructions for the installation of the venting system design or the venting system components; and

2.A complete parts list for the venting system design or venting system.

MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED

When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies “special venting systems,” the following requirements shall be satisfied by the manufacturer:

1.The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and

2.The “special venting systems” shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions.

A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.

21

Image 21
Contents Commercial gas water heaters Table Of Contents Approvals Safe Installation, Use and ServicePrecautions General Safety InformationHydrogen Gas Flammable Overheated water can cause water tank explosionInstalling, using or servicing Water heater Fire or Explosion HazardFire and Explosion Hazard Introduction Preparing For The InstallationAbbreviations Used QualificationsBasic Operation Features And ComponentsWater Heater’s 120 VAC on/off switch Top Views 120,000 & 150,000SUF 120 & 150 Components Top Views SUF 199 & 250 ComponentsWater heaters 24 Volt Gas Valve Left Side Right Side Installation Considerations Rough In DimensionsTOP Views Locating The Water Heater Recovery CapacitiesGas Line Connection Size Storage CapacitiesOptional Concentric Terminations Extended Vent TerminationsHard Water Circulation PumpsPower Supply Installation RequirementsGas Pressure Requirements Supply Gas LineDishwashing Machines Mixing ValvesClosed Water Systems Thermal ExpansionTemperature-Pressure Relief Valve Water Damage HazardValve Discharge Pipe Requirements Combustible Material Storage Condensate DrainContaminated Air Condensate Drain Water TrapAir Requirements Breathing Hazard Carbon Monoxide GasUnconfined Space Confined SpaceOutdoor Air Through Two Openings Fresh Air Openings For Confined SpacesOutdoor Air Through One Opening Outdoor Air Through Two Horizontal DuctsPage Inspection Commonwealth of MassachusettsVenting Installation General Venting InformationGeneral Venting Instructions Correct Orientation SUF 199 & SUF 250 Intake Air ConnectionLarge Hose Fernco Clamp TEE FittingVenting Requirements Venting Installation Sequence Power Vent InstallationDirect Vent Installation Field Supplied Intake AIR ScreenStandard Factory Supplied Terminations Vertical Termination InstallationMaximum Factory Supplied Standard Termination Field Supplied STRAP/SUPPORTIntake AIR AND/OR Vent Exhaust Sidewall Termination Installation Determine the location for the termination Concentric Termination InstallationInch Concentric Termination KIT Inch Concentric Termination InstallationThree Concentric Terminations TWO Concentric TerminationsFour Concentric Terminations Eight Concentric TerminationsTwo Concentric Terminations Multiple Concentric Termination ArrangementsEight Concentric Terminations Sidewall RoofPower Vent Horizontal Venting ArrangementsDirect Vent Horizontal Direct Vent Vertical Vent Horizontal Intake Direct Vent Horizontal Vent Vertical IntakeDirect Vent Horizontal Concentric Power Vent Termination Clearances Sidewall Power VentDirect Vent Termination Clearances Sidewall Direct VentCondensate Drain Installation Water Heater InstallationInstallation Notes Installation InstructionsGas Line Sizing Supply Gas Line InstallationSupply Gas Line Sizing U. S. Units Supply Gas Line Sizing Metric UnitsSupply Gas Regulator Installation Gas Line Leak TestingGas Line Connection Power Supply Connections Electrical WiringEnable/Disable Circuit Connecting An External Supervisory ControlWater Line Connections Water Piping DiagramsValve Discharge Pipe Thermometers not SuppliedHigh Temperature Limit Control ECO Temperature RegulationHigh Temperature Applications Thermostat ControlControl System Operation Tank Temperature 103F Operating Set Point 120FOverview Control System NavigationIcon Description Status IconsState Description Operating StatesControl System Menus Menu DescriptionUpdate Cancel User Settings & Control System MenusBack Help Description/Action DisplayChange Back Help Heater Information Description/Action Display Display Settings Description/ActionView Back Help Back AdvancedECO YESService Contact Information UpdateSelect Back Help NameStart Up Prior to Start upInitial Start Up GAS Valve TOP Detail View GAS Valve / Venturi Assembly TOP ViewLighting The Water Heater Gas pressure reading while the water heater is firingMultiple Appliance Installations Checking The Firing Rate High Altitude Installations1050 = 300,000 Btu/hr 87.9 kW To Turn Off GasLighting The Water Heater SUF 60 120 and SUF 100 150 Models onlyLighting & Operation Labels SUF 100 199 and SUF 100 250 Models only Tank Temperature 103F Operating Set Point 120FTroubleshooting Installation ChecklistSequence Of Operation Sequence Of Operation Flow Chart Closed by control system Fault Msg is displayedPre-Purge cycle Installation Errors Operational ProblemsRough Starting, Rough Operation Momentary IgnitionFault And Alert Conditions Fault And Alert Messages Possible Causes Check/Repair Displayed Fault/Alert MessageBack Advanced No Anode Voltage Blower Prover FailureMaintenance Schedule MaintenanceGeneral Draining And FlushingSediment Removal Filling The Water HeaterLime Scale Removal Manual Lime Scale RemovalDrain Valve and Access Panels Powered Anode RodsTemperature-Pressure Relief Valve Test Vent SystemJ3 J5 DiagramsJ10 J13 J11 CCB Central Control Board LayoutUser Interface Modul SUF 120 & 150 Wiring DiagramCCB Central Control Board SUF 199 & 250 Wiring DiagramCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water State Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty