State Industries SUF-100-250, SUF-60-120 instruction manual Water Piping Diagrams

Page 75

Water Piping Diagrams

Before installation of water piping review the following:

1.See Mixing Valves on page 15.

2.See Dishwashing Machines on page 15.

3.See Temperature-Pressure Relief Valve on page 16.

TWO WATER HEATERS, SINGLE TEMPERATURE WITH BUILDING RECIRCULATION

4.See Closed Systems and Thermal Expansion on page 15

5.See Water Line Connections on page 42.

6.If a pump is being installed between a water heater and storage tank or on a building recirculation loop wire according to Figure 68 on page 70.

7.If a pump is being installed in a recirculation loop between the water heater and a commercial dishwasher wire according to Figure 68 or Figure 69 on page 70.

LEGEND

WARNING: THIS DRAWING SHOWS SUGGESTED PIPING CONFIGURATION AND OTHER DEVICES; CHECK WITH LOCAL CODES AND ORDINANCES FOR ADDITIONAL REQUIREMENTS.

HOT WATER

OUTLET

TEMPERATURE & PRESSURE RELIEF VALVE

PRESSURE RELIEF VALVE

CIRCULATING PUMP

TANK OR LINE TEMPERATURE CONTROL

DRAIN

FULL PORT BALL VALVE

CHECK VALVE

TEMPERATURE GAGE

WATER FLOW SWITCH

75

PIPE T&P TO

OPEN DRAIN

FINISHED

FLOOR

PIPE T&P TO OPEN DRAIN

LINE TEMPERATURE

CONTROL

HOT WATER

RETURN

COLD WATER

SUPPLY

EXPANSION

TANK

Image 75
Contents Commercial gas water heaters Table Of Contents Approvals Safe Installation, Use and ServiceOverheated water can cause water tank explosion General Safety InformationPrecautions Hydrogen Gas FlammableInstalling, using or servicing Water heater Fire or Explosion HazardFire and Explosion Hazard Qualifications Preparing For The InstallationIntroduction Abbreviations UsedBasic Operation Features And ComponentsWater Heater’s 120 VAC on/off switch Top Views 120,000 & 150,000SUF 120 & 150 Components Top Views SUF 199 & 250 ComponentsWater heaters 24 Volt Gas Valve Left Side Right Side Installation Considerations Rough In DimensionsTOP Views Storage Capacities Recovery CapacitiesLocating The Water Heater Gas Line Connection SizeCirculation Pumps Extended Vent TerminationsOptional Concentric Terminations Hard WaterSupply Gas Line Installation RequirementsPower Supply Gas Pressure RequirementsThermal Expansion Mixing ValvesDishwashing Machines Closed Water SystemsTemperature-Pressure Relief Valve Water Damage HazardValve Discharge Pipe Requirements Condensate Drain Water Trap Condensate DrainCombustible Material Storage Contaminated AirConfined Space Breathing Hazard Carbon Monoxide GasAir Requirements Unconfined SpaceOutdoor Air Through Two Horizontal Ducts Fresh Air Openings For Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through One OpeningPage Inspection Commonwealth of MassachusettsVenting Installation General Venting InformationGeneral Venting Instructions TEE Fitting SUF 199 & SUF 250 Intake Air ConnectionCorrect Orientation Large Hose Fernco ClampVenting Requirements Venting Installation Sequence Power Vent InstallationDirect Vent Installation Field Supplied Intake AIR ScreenStandard Factory Supplied Terminations Vertical Termination InstallationMaximum Factory Supplied Standard Termination Field Supplied STRAP/SUPPORTIntake AIR AND/OR Vent Exhaust Sidewall Termination Installation Determine the location for the termination Concentric Termination InstallationInch Concentric Termination KIT Inch Concentric Termination InstallationEight Concentric Terminations TWO Concentric TerminationsThree Concentric Terminations Four Concentric TerminationsSidewall Roof Multiple Concentric Termination ArrangementsTwo Concentric Terminations Eight Concentric TerminationsPower Vent Horizontal Venting ArrangementsDirect Vent Horizontal Direct Vent Vertical Vent Horizontal Intake Direct Vent Horizontal Vent Vertical IntakeDirect Vent Horizontal Concentric Power Vent Termination Clearances Sidewall Power VentDirect Vent Termination Clearances Sidewall Direct VentInstallation Instructions Water Heater InstallationCondensate Drain Installation Installation NotesSupply Gas Line Sizing Metric Units Supply Gas Line InstallationGas Line Sizing Supply Gas Line Sizing U. S. UnitsSupply Gas Regulator Installation Gas Line Leak TestingGas Line Connection Connecting An External Supervisory Control Electrical WiringPower Supply Connections Enable/Disable CircuitThermometers not Supplied Water Piping DiagramsWater Line Connections Valve Discharge PipeThermostat Control Temperature RegulationHigh Temperature Limit Control ECO High Temperature ApplicationsControl System Navigation Tank Temperature 103F Operating Set Point 120FControl System Operation OverviewIcon Description Status IconsMenu Description Operating StatesState Description Control System MenusDescription/Action Display User Settings & Control System MenusUpdate Cancel Back HelpChange Back Help Heater Information Description/Action Display Display Settings Description/ActionYES Back AdvancedView Back Help ECOName UpdateService Contact Information Select Back HelpStart Up Prior to Start upInitial Start Up Gas pressure reading while the water heater is firing GAS Valve / Venturi Assembly TOP ViewGAS Valve TOP Detail View Lighting The Water HeaterMultiple Appliance Installations To Turn Off Gas High Altitude InstallationsChecking The Firing Rate 1050 = 300,000 Btu/hr 87.9 kWLighting The Water Heater SUF 60 120 and SUF 100 150 Models onlyLighting & Operation Labels SUF 100 199 and SUF 100 250 Models only Tank Temperature 103F Operating Set Point 120FTroubleshooting Installation ChecklistSequence Of Operation Sequence Of Operation Flow Chart Closed by control system Fault Msg is displayedPre-Purge cycle Momentary Ignition Operational ProblemsInstallation Errors Rough Starting, Rough OperationFault And Alert Conditions Fault And Alert Messages Possible Causes Check/Repair Displayed Fault/Alert MessageBack Advanced No Anode Voltage Blower Prover FailureDraining And Flushing MaintenanceMaintenance Schedule GeneralManual Lime Scale Removal Filling The Water HeaterSediment Removal Lime Scale RemovalVent System Powered Anode RodsDrain Valve and Access Panels Temperature-Pressure Relief Valve TestCCB Central Control Board Layout DiagramsJ3 J5 J10 J13 J11User Interface Modul SUF 120 & 150 Wiring DiagramCCB Central Control Board SUF 199 & 250 Wiring DiagramCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water State Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty