State Industries SUF-100-250, SUF-60-120 HOT Water Outlet Pipe T&P to Open Drain Finished Floor

Page 77

Water Piping Diagrams

Before installation of water piping review the following:

1.See Mixing Valves on page 15.

2.See Dishwashing Machines on page 15.

3.See Temperature-Pressure Relief Valve on page 16.

4.See Closed Systems and Thermal Expansion on page 15

5.See Water Line Connections on page 42.

6.If a pump is being installed between a water heater and storage tank or on a building recirculation loop wire according to Figure 68 on page 70.

7.If a pump is being installed in a recirculation loop between the water heater and a commercial dishwasher wire according to Figure 68 or Figure 69 on page 70.

FOUR WATER HEATERS, SINGLE TEMPERATURE WITH BUILDING RECIRCULATION

LEGEND

77

WARNING: THIS DRAWING SHOWS SUGGESTED PIPING CONFIGURATION AND OTHER DEVICES; CHECK WITH LOCAL CODES AND ORDINANCES FOR ADDITIONAL REQUIREMENTS.

TEMPERATURE & PRESSURE RELIEF VALVE

PRESSURE RELIEF VALVE

CIRCULATING PUMP

TANK OR LINE TEMPERATURE CONTROL

DRAIN

FULL PORT BALL VALVE

CHECK VALVE

TEMPERATURE GAGE

WATER FLOW SWITCH

HOT WATER

OUTLET

PIPE T&P TO

OPEN DRAIN

FINISHED

FLOOR

PIPE T&P TO OPEN DRAIN

PIPE T&P TO OPEN DRAIN

 

LINE TEMPERATURE

 

CONTROL

PIPE T&P TO

HOT WATER

OPEN DRAIN

RETURN

 

COLD WATER

SUPPLY

EXPANSION

TANK

Image 77
Contents Commercial gas water heaters Table Of Contents Approvals Safe Installation, Use and ServicePrecautions General Safety InformationHydrogen Gas Flammable Overheated water can cause water tank explosionFire and Explosion Hazard Installing, using or servicing Water heaterFire or Explosion Hazard Introduction Preparing For The InstallationAbbreviations Used QualificationsBasic Operation Features And ComponentsSUF 120 & 150 Components Water Heater’s 120 VAC on/off switchTop Views 120,000 & 150,000 Water heaters 24 Volt Gas Valve Top ViewsSUF 199 & 250 Components Left Side Right Side TOP Views Installation ConsiderationsRough In Dimensions Locating The Water Heater Recovery CapacitiesGas Line Connection Size Storage CapacitiesOptional Concentric Terminations Extended Vent TerminationsHard Water Circulation PumpsPower Supply Installation RequirementsGas Pressure Requirements Supply Gas LineDishwashing Machines Mixing ValvesClosed Water Systems Thermal ExpansionValve Discharge Pipe Requirements Temperature-Pressure Relief ValveWater Damage Hazard Combustible Material Storage Condensate DrainContaminated Air Condensate Drain Water TrapAir Requirements Breathing Hazard Carbon Monoxide GasUnconfined Space Confined SpaceOutdoor Air Through Two Openings Fresh Air Openings For Confined SpacesOutdoor Air Through One Opening Outdoor Air Through Two Horizontal DuctsPage Inspection Commonwealth of MassachusettsGeneral Venting Instructions Venting InstallationGeneral Venting Information Correct Orientation SUF 199 & SUF 250 Intake Air ConnectionLarge Hose Fernco Clamp TEE FittingVenting Requirements Direct Vent Installation Venting Installation SequencePower Vent Installation Field Supplied Intake AIR ScreenStandard Factory Supplied Terminations Vertical Termination InstallationIntake AIR AND/OR Vent Exhaust Maximum Factory Supplied Standard TerminationField Supplied STRAP/SUPPORT Sidewall Termination Installation Determine the location for the termination Concentric Termination InstallationInch Concentric Termination KIT Inch Concentric Termination InstallationThree Concentric Terminations TWO Concentric TerminationsFour Concentric Terminations Eight Concentric TerminationsTwo Concentric Terminations Multiple Concentric Termination ArrangementsEight Concentric Terminations Sidewall RoofDirect Vent Horizontal Power Vent HorizontalVenting Arrangements Direct Vent Horizontal Concentric Direct Vent Vertical Vent Horizontal IntakeDirect Vent Horizontal Vent Vertical Intake Power Vent Termination Clearances Sidewall Power VentDirect Vent Termination Clearances Sidewall Direct VentCondensate Drain Installation Water Heater InstallationInstallation Notes Installation InstructionsGas Line Sizing Supply Gas Line InstallationSupply Gas Line Sizing U. S. Units Supply Gas Line Sizing Metric UnitsGas Line Connection Supply Gas Regulator InstallationGas Line Leak Testing Power Supply Connections Electrical WiringEnable/Disable Circuit Connecting An External Supervisory ControlWater Line Connections Water Piping DiagramsValve Discharge Pipe Thermometers not SuppliedHigh Temperature Limit Control ECO Temperature RegulationHigh Temperature Applications Thermostat ControlControl System Operation Tank Temperature 103F Operating Set Point 120FOverview Control System NavigationIcon Description Status IconsState Description Operating StatesControl System Menus Menu DescriptionUpdate Cancel User Settings & Control System MenusBack Help Description/Action DisplayChange Back Help Heater Information Description/Action Display Display Settings Description/ActionView Back Help Back AdvancedECO YESService Contact Information UpdateSelect Back Help NameInitial Start Up Start UpPrior to Start up GAS Valve TOP Detail View GAS Valve / Venturi Assembly TOP ViewLighting The Water Heater Gas pressure reading while the water heater is firingMultiple Appliance Installations Checking The Firing Rate High Altitude Installations1050 = 300,000 Btu/hr 87.9 kW To Turn Off GasLighting & Operation Labels Lighting The Water HeaterSUF 60 120 and SUF 100 150 Models only SUF 100 199 and SUF 100 250 Models only Tank Temperature 103F Operating Set Point 120FSequence Of Operation TroubleshootingInstallation Checklist Pre-Purge cycle Sequence Of Operation Flow ChartClosed by control system Fault Msg is displayed Installation Errors Operational ProblemsRough Starting, Rough Operation Momentary IgnitionFault And Alert Conditions Back Advanced Fault And Alert MessagesPossible Causes Check/Repair Displayed Fault/Alert Message No Anode Voltage Blower Prover FailureMaintenance Schedule MaintenanceGeneral Draining And FlushingSediment Removal Filling The Water HeaterLime Scale Removal Manual Lime Scale RemovalDrain Valve and Access Panels Powered Anode RodsTemperature-Pressure Relief Valve Test Vent SystemJ3 J5 DiagramsJ10 J13 J11 CCB Central Control Board LayoutUser Interface Modul SUF 120 & 150 Wiring DiagramCCB Central Control Board SUF 199 & 250 Wiring DiagramCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water State Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty