SUF 100 199 and SUF 100 250 models are factory equipped with a unique Combustion Blower and intake air connection Tee fitting. The Tee is a 3" x 3" x 1/2" fitting. The intake air connection Tee fitting has a hose barb installed in the 1/2 inch branch to connect the Blocked Intake Air switch sensing tube, see Figure 15.

The intake air Tee fitting is factory installed with the 1/2 inch branch and hose barb angled to the right at approximately 130° when viewed from the end, see Figure 16. The Tee fitting's 1/2 inch branch and hose barb must not be angled any lower (towards the ground) than this factory specification. Angling higher, up to a 90° position, will not adversely affect operation and is acceptable.

Inspect/Adjust Intake Air Tee Fitting

FACTORY INSTALLED INTAKE AIR TEE FITTING

1/2 INCH BRANCH

HOSE BARB FITTING FOR BLOCKED INTAKE AIR SWITCH SENSING TUBE

COMBUSTION BLOWER

FERNCO

COUPLING

Inspect the angle of the Tee fitting's 1/2 inch branch and hose barb while viewing from the end of the Tee, see Figure 16. If the angle of the Tee fitting 1/2 inch branch and hose barb is lower than shown, adjustment will be necessary. To adjust the intake air Tee fitting angle follow the steps listed below.

Adjustment Procedure:

1.

Ensure the water heater is turned off at the on/off switch on

 

the front of the water heater.

2.

Disconnect the Blocked Intake Air switch sensing tube, see

 

Figure 4 on page 9 for location.

3.

Loosen the large hose clamp on the Fernco coupling that

 

connects the intake air connection pipe to the Combustion

 

blower, see Figure 17.

4.

Adjust the angle of the Tee fitting so that the 1/2 inch branch

COMBUSTION BLOWER ASSEMBLY 199,000 & 250,000 Btu/hr MODELS

Figure 15

Ensure the hose barb installed in the Tee fitting is not facing down towards the ground (180° - 6 o'clock position) before venting installation begins. The barb fitting must be angled between 90° and no more than 130° as shown in Figure 16. If the barb fitting is facing down, residual condensate that occasionally forms in the intake air pipe can drain into the Blocked Intake Air switch through the attached sensing tube and damage the switch. This condition can also lead to Blocked Intake Air fault conditions and associated control system lock outs.

90° TO 130°

END VIEW

CORRECT ORIENTATION

INTAKE AIR TEE FITTING

Figure 16

 

and hose barb are at the proper angle as shown in Figure 16.

5.

Retighten the large hose clamp on the Combustion Blower

 

intake air Fernco coupling,

6.

Reconnect the Blocked Intake Air switch sensing tube making

 

sure the sensing tube is securely connected at both ends and

 

is not kinked.

LARGE HOSE

FERNCO

CLAMP

COUPLING

INTAKE AIR

3 INCH PVC

TEE FITTING

 

INTAKE AIR CONNECTION PIPE 199,000 & 250,000 Btu/hr MODELS

Figure 17

23

Image 23
Contents Commercial gas water heaters Table Of Contents Approvals Safe Installation, Use and ServiceOverheated water can cause water tank explosion General Safety InformationPrecautions Hydrogen Gas FlammableFire and Explosion Hazard Installing, using or servicing Water heaterFire or Explosion Hazard Qualifications Preparing For The InstallationIntroduction Abbreviations UsedBasic Operation Features And ComponentsSUF 120 & 150 Components Water Heater’s 120 VAC on/off switchTop Views 120,000 & 150,000 Water heaters 24 Volt Gas Valve Top ViewsSUF 199 & 250 Components Left Side Right Side TOP Views Installation ConsiderationsRough In Dimensions Storage Capacities Recovery CapacitiesLocating The Water Heater Gas Line Connection SizeCirculation Pumps Extended Vent TerminationsOptional Concentric Terminations Hard WaterSupply Gas Line Installation RequirementsPower Supply Gas Pressure RequirementsThermal Expansion Mixing ValvesDishwashing Machines Closed Water SystemsValve Discharge Pipe Requirements Temperature-Pressure Relief ValveWater Damage Hazard Condensate Drain Water Trap Condensate DrainCombustible Material Storage Contaminated AirConfined Space Breathing Hazard Carbon Monoxide GasAir Requirements Unconfined SpaceOutdoor Air Through Two Horizontal Ducts Fresh Air Openings For Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through One OpeningPage Inspection Commonwealth of MassachusettsGeneral Venting Instructions Venting InstallationGeneral Venting Information TEE Fitting SUF 199 & SUF 250 Intake Air ConnectionCorrect Orientation Large Hose Fernco ClampVenting Requirements Direct Vent Installation Venting Installation SequencePower Vent Installation Field Supplied Intake AIR ScreenStandard Factory Supplied Terminations Vertical Termination InstallationIntake AIR AND/OR Vent Exhaust Maximum Factory Supplied Standard TerminationField Supplied STRAP/SUPPORT Sidewall Termination Installation Determine the location for the termination Concentric Termination InstallationInch Concentric Termination KIT Inch Concentric Termination InstallationEight Concentric Terminations TWO Concentric TerminationsThree Concentric Terminations Four Concentric TerminationsSidewall Roof Multiple Concentric Termination ArrangementsTwo Concentric Terminations Eight Concentric TerminationsDirect Vent Horizontal Power Vent HorizontalVenting Arrangements Direct Vent Horizontal Concentric Direct Vent Vertical Vent Horizontal IntakeDirect Vent Horizontal Vent Vertical Intake Power Vent Termination Clearances Sidewall Power VentDirect Vent Termination Clearances Sidewall Direct VentInstallation Instructions Water Heater InstallationCondensate Drain Installation Installation NotesSupply Gas Line Sizing Metric Units Supply Gas Line InstallationGas Line Sizing Supply Gas Line Sizing U. S. UnitsGas Line Connection Supply Gas Regulator InstallationGas Line Leak Testing Connecting An External Supervisory Control Electrical WiringPower Supply Connections Enable/Disable CircuitThermometers not Supplied Water Piping DiagramsWater Line Connections Valve Discharge PipeThermostat Control Temperature RegulationHigh Temperature Limit Control ECO High Temperature ApplicationsControl System Navigation Tank Temperature 103F Operating Set Point 120FControl System Operation OverviewIcon Description Status IconsMenu Description Operating StatesState Description Control System MenusDescription/Action Display User Settings & Control System MenusUpdate Cancel Back HelpChange Back Help Heater Information Description/Action Display Display Settings Description/ActionYES Back AdvancedView Back Help ECOName UpdateService Contact Information Select Back HelpInitial Start Up Start UpPrior to Start up Gas pressure reading while the water heater is firing GAS Valve / Venturi Assembly TOP ViewGAS Valve TOP Detail View Lighting The Water HeaterMultiple Appliance Installations To Turn Off Gas High Altitude InstallationsChecking The Firing Rate 1050 = 300,000 Btu/hr 87.9 kWLighting & Operation Labels Lighting The Water HeaterSUF 60 120 and SUF 100 150 Models only SUF 100 199 and SUF 100 250 Models only Tank Temperature 103F Operating Set Point 120FSequence Of Operation TroubleshootingInstallation Checklist Pre-Purge cycle Sequence Of Operation Flow ChartClosed by control system Fault Msg is displayed Momentary Ignition Operational ProblemsInstallation Errors Rough Starting, Rough OperationFault And Alert Conditions Back Advanced Fault And Alert MessagesPossible Causes Check/Repair Displayed Fault/Alert Message No Anode Voltage Blower Prover FailureDraining And Flushing MaintenanceMaintenance Schedule GeneralManual Lime Scale Removal Filling The Water HeaterSediment Removal Lime Scale RemovalVent System Powered Anode RodsDrain Valve and Access Panels Temperature-Pressure Relief Valve TestCCB Central Control Board Layout DiagramsJ3 J5 J10 J13 J11User Interface Modul SUF 120 & 150 Wiring DiagramCCB Central Control Board SUF 199 & 250 Wiring DiagramCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water State Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty