State Industries SUF-100-250, SUF-60-120 Inch Concentric Termination Installation

Page 31

4 Inch Concentric Termination Installation

 

 

 

INTAKE AIR CONNECTION

INTAKE AIR PIPE

 

 

 

3 INCH PVC

 

VENT PIPE

 

 

 

 

3” x 3” x 4”

 

 

 

 

 

Y FITTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

When installing 4 inch intake air and vent pipe - connect the piping to the concentric termination using field supplied 4" x 3" reducer couplings and short sections of 3 inch pipe (18 inches or less) pipe. Cement all fittings and pipe in place.

9.Return to Direct Vent Installation on page 25 to complete the installation of the intake air and vent piping between the concentric termination and the water heater.

VENT CONNECTION - 3 INCH PVC

VENT CAP

VENT PIPE IS 2 1/2 INCH SDR-26 PIPE SUPPLIED LENGTH 37 INCHES (94 cm)

MAXIMUM ALLOWABLE LENGTH 73 INCHES (185 cm) MINIMUM ALLOWABLE LENGTH 25 INCHES (64 cm)

INTAKE AIR PIPE IS 4 INCH SDR-26 PIPE SUPPLIED LENGTH 24 INCHES (60 cm)

MAXIMUM ALLOWABLE LENGTH 60 INCHES (152 cm) MINIMUM ALLOWABLE LENGTH 12 INCHES (30 cm)

INTAKE AIR PIPE

Y FITTING ASSEMBLY

VENT CAP

VENT PIPE ASSEMBLY

COMBUSTION

AIR

ROOF FLASHING (field supplied)

VENT

MAINTAIN 12” (30 cm) 18” (45 cm) FOR CANADA MINIMUM CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL. MAXIMUM OF 24” (60 cm) ABOVE ROOF.

STRAP (field supplied)

NOTE: SECURING STRAP MUST BE FIELD INSTALLED TO PREVENT MOVEMENT OF TERMINATION KIT

4 INCH CONCENTRIC TERMINATION KIT

FOUR PIECE KIT - FIELD ASSEMBLY REQUIRED

Figure 29

Assemble and install the 4 inch concentric termination. Refer to Figure 29, Figure 30 and Figure 31 for these instructions:

1.

Cement the Y fitting to the larger diameter intake air pipe.

2.

Slide the intake air pipe and Y fitting assembly from inside the

VENT

INTAKE

PIPE

AIR PIPE

4 INCH CONCENTRIC TERMINATION

VERTICAL INSTALLATION

Figure 30

 

building through the hole cut for the termination in the roof

 

or sidewall. Ensure no foreign materials such as insulation

 

accumulate inside the assembly.

3.

Secure the intake air Y fitting assembly using field supplied

 

metal strapping or equivalent support materials.

4.

On installations installed through the roof slide a field

 

supplied plumbing boot or roof flashing over the intake air Y

 

fitting assembly and secure it to the roof.

5.

Seal around the plumbing boot or roof flashing.

6.

Cement the vent cap onto the vent pipe. Alternately a field-

 

supplied stainless steel screw may be used to secure the 2

 

components together when field disassembly is desired for

 

cleaning. A pilot hole must be drilled for the screw to prevent

 

damage/cracking of the vent cap and/or vent pipe.

NOTE: SECURING STRAP MUST BE FIELD INSTALLED TO PREVENT MOVEMENT OF TERMINATION KIT IN SIDEWALL.

VENT

STRAP

PIPE

(field supplied)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMBUSTION

AIR

VENT

1 INCH

MAXIMUM

7.

Install the vent cap/vent pipe assembly into the intake air Y

 

fitting assembly, Ensure small diameter vent pipe is cemented

 

and bottomed in the Y fitting.

8.

When installing 3 inch intake air and vent piping connect

 

and cement the pipe directly to the concentric termination.

INTAKE

AIR PIPE

4 INCH CONCENTRIC TERMINATION

SIDEWALL INSTALLATION

Figure 31

31

Image 31
Contents Commercial gas water heaters Table Of Contents Approvals Safe Installation, Use and ServiceOverheated water can cause water tank explosion General Safety InformationPrecautions Hydrogen Gas FlammableFire or Explosion Hazard Installing, using or servicing Water heaterFire and Explosion Hazard Qualifications Preparing For The InstallationIntroduction Abbreviations UsedBasic Operation Features And ComponentsTop Views 120,000 & 150,000 Water Heater’s 120 VAC on/off switchSUF 120 & 150 Components SUF 199 & 250 Components Top ViewsWater heaters 24 Volt Gas Valve Left Side Right Side Rough In Dimensions Installation ConsiderationsTOP Views Storage Capacities Recovery CapacitiesLocating The Water Heater Gas Line Connection SizeCirculation Pumps Extended Vent TerminationsOptional Concentric Terminations Hard WaterSupply Gas Line Installation RequirementsPower Supply Gas Pressure RequirementsThermal Expansion Mixing ValvesDishwashing Machines Closed Water SystemsWater Damage Hazard Temperature-Pressure Relief ValveValve Discharge Pipe Requirements Condensate Drain Water Trap Condensate DrainCombustible Material Storage Contaminated AirConfined Space Breathing Hazard Carbon Monoxide GasAir Requirements Unconfined SpaceOutdoor Air Through Two Horizontal Ducts Fresh Air Openings For Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through One OpeningPage Inspection Commonwealth of MassachusettsGeneral Venting Information Venting InstallationGeneral Venting Instructions TEE Fitting SUF 199 & SUF 250 Intake Air ConnectionCorrect Orientation Large Hose Fernco ClampVenting Requirements Power Vent Installation Venting Installation SequenceDirect Vent Installation Field Supplied Intake AIR ScreenStandard Factory Supplied Terminations Vertical Termination InstallationField Supplied STRAP/SUPPORT Maximum Factory Supplied Standard TerminationIntake AIR AND/OR Vent Exhaust Sidewall Termination Installation Determine the location for the termination Concentric Termination InstallationInch Concentric Termination KIT Inch Concentric Termination InstallationEight Concentric Terminations TWO Concentric TerminationsThree Concentric Terminations Four Concentric TerminationsSidewall Roof Multiple Concentric Termination ArrangementsTwo Concentric Terminations Eight Concentric TerminationsVenting Arrangements Power Vent HorizontalDirect Vent Horizontal Direct Vent Horizontal Vent Vertical Intake Direct Vent Vertical Vent Horizontal IntakeDirect Vent Horizontal Concentric Power Vent Termination Clearances Sidewall Power VentDirect Vent Termination Clearances Sidewall Direct VentInstallation Instructions Water Heater InstallationCondensate Drain Installation Installation NotesSupply Gas Line Sizing Metric Units Supply Gas Line InstallationGas Line Sizing Supply Gas Line Sizing U. S. UnitsGas Line Leak Testing Supply Gas Regulator InstallationGas Line Connection Connecting An External Supervisory Control Electrical WiringPower Supply Connections Enable/Disable CircuitThermometers not Supplied Water Piping DiagramsWater Line Connections Valve Discharge PipeThermostat Control Temperature RegulationHigh Temperature Limit Control ECO High Temperature ApplicationsControl System Navigation Tank Temperature 103F Operating Set Point 120FControl System Operation OverviewIcon Description Status IconsMenu Description Operating StatesState Description Control System MenusDescription/Action Display User Settings & Control System MenusUpdate Cancel Back HelpChange Back Help Heater Information Description/Action Display Display Settings Description/ActionYES Back AdvancedView Back Help ECOName UpdateService Contact Information Select Back HelpPrior to Start up Start UpInitial Start Up Gas pressure reading while the water heater is firing GAS Valve / Venturi Assembly TOP ViewGAS Valve TOP Detail View Lighting The Water HeaterMultiple Appliance Installations To Turn Off Gas High Altitude InstallationsChecking The Firing Rate 1050 = 300,000 Btu/hr 87.9 kWSUF 60 120 and SUF 100 150 Models only Lighting The Water HeaterLighting & Operation Labels SUF 100 199 and SUF 100 250 Models only Tank Temperature 103F Operating Set Point 120FInstallation Checklist TroubleshootingSequence Of Operation Closed by control system Fault Msg is displayed Sequence Of Operation Flow ChartPre-Purge cycle Momentary Ignition Operational ProblemsInstallation Errors Rough Starting, Rough OperationFault And Alert Conditions Possible Causes Check/Repair Displayed Fault/Alert Message Fault And Alert MessagesBack Advanced No Anode Voltage Blower Prover FailureDraining And Flushing MaintenanceMaintenance Schedule GeneralManual Lime Scale Removal Filling The Water HeaterSediment Removal Lime Scale RemovalVent System Powered Anode RodsDrain Valve and Access Panels Temperature-Pressure Relief Valve TestCCB Central Control Board Layout DiagramsJ3 J5 J10 J13 J11User Interface Modul SUF 120 & 150 Wiring DiagramCCB Central Control Board SUF 199 & 250 Wiring DiagramCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water State Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty