State Industries SUF-60-120, SUF-100-250 instruction manual Temperature & Pressure

Page 72

Water Piping Diagrams

Before installation of water piping review the following:

1.See Mixing Valves on page 15.

2.See Dishwashing Machines on page 15.

3.See Temperature-Pressure Relief Valve on page 16.

4.See Closed Systems and Thermal Expansion on page 15

5.See Water Line Connections on page 42.

6.If a pump is being installed between a water heater and storage tank or on a building recirculation loop wire according to Figure 68 on page 70.

7.If a pump is being installed in a recirculation loop between the water heater and a commercial dishwasher wire according to Figure 68 or Figure 69 on page 70.

ONE WATER HEATER, TWO TEMPERATURE WITH HIGH TEMPERAURE LOOP RECIRCULATION WITH BUILDING RECIRCULATION

LEGEND

TEMPERATURE & PRESSURE

FULL PORT BALL VALVE

RELIEF VALVE

 

 

MIXING VALVE

72

WARNING: THIS DRAWING SHOWS SUGGESTED PIPING CONFIGURATION AND OTHER DEVICES; CHECK WITH LOCAL CODES AND ORDINANCES FOR ADDITIONAL REQUIREMENTS.

LINE TEMPERATURE

CONTROL

TEMPERED WATER

RETURN

COLD WATER

SUPPLY

TEMPERED

WATER

TO FIXTURES

HOT WATER

OUTLET

12” TO 15”

MINIMUMHOT

MIXING VALVE

PRESSURE RELIEF VALVE

 

 

 

 

 

 

CIRCULATING PUMP

 

 

 

 

 

CHECK VALVE

 

 

 

 

 

 

TANK OR LINE TEMPERATURE

 

 

 

 

 

TEMPERATURE GAGE

CONTROL

 

 

 

 

 

WATER FLOW SWITCH

DRAIN

 

 

 

 

 

PIPE T&P TO

OPEN DRAIN

HOT WATER

COLD

 

RETURN

 

 

LINE TEMPERATURE

 

CONTROL

EXPANSION

TANK

Image 72
Contents Commercial gas water heaters Table Of Contents Safe Installation, Use and Service ApprovalsGeneral Safety Information PrecautionsHydrogen Gas Flammable Overheated water can cause water tank explosionInstalling, using or servicing Water heater Fire or Explosion HazardFire and Explosion Hazard Preparing For The Installation IntroductionAbbreviations Used QualificationsFeatures And Components Basic OperationWater Heater’s 120 VAC on/off switch Top Views 120,000 & 150,000SUF 120 & 150 Components Top Views SUF 199 & 250 ComponentsWater heaters 24 Volt Gas Valve Left Side Right Side Installation Considerations Rough In DimensionsTOP Views Recovery Capacities Locating The Water HeaterGas Line Connection Size Storage CapacitiesExtended Vent Terminations Optional Concentric TerminationsHard Water Circulation PumpsInstallation Requirements Power SupplyGas Pressure Requirements Supply Gas LineMixing Valves Dishwashing MachinesClosed Water Systems Thermal ExpansionTemperature-Pressure Relief Valve Water Damage HazardValve Discharge Pipe Requirements Condensate Drain Combustible Material StorageContaminated Air Condensate Drain Water TrapBreathing Hazard Carbon Monoxide Gas Air RequirementsUnconfined Space Confined SpaceFresh Air Openings For Confined Spaces Outdoor Air Through Two OpeningsOutdoor Air Through One Opening Outdoor Air Through Two Horizontal DuctsPage Commonwealth of Massachusetts InspectionVenting Installation General Venting InformationGeneral Venting Instructions SUF 199 & SUF 250 Intake Air Connection Correct OrientationLarge Hose Fernco Clamp TEE FittingVenting Requirements Venting Installation Sequence Power Vent InstallationDirect Vent Installation Intake AIR Screen Field SuppliedVertical Termination Installation Standard Factory Supplied TerminationsMaximum Factory Supplied Standard Termination Field Supplied STRAP/SUPPORTIntake AIR AND/OR Vent Exhaust Sidewall Termination Installation Concentric Termination Installation Determine the location for the terminationInch Concentric Termination Installation Inch Concentric Termination KITTWO Concentric Terminations Three Concentric TerminationsFour Concentric Terminations Eight Concentric TerminationsMultiple Concentric Termination Arrangements Two Concentric TerminationsEight Concentric Terminations Sidewall RoofPower Vent Horizontal Venting ArrangementsDirect Vent Horizontal Direct Vent Vertical Vent Horizontal Intake Direct Vent Horizontal Vent Vertical IntakeDirect Vent Horizontal Concentric Termination Clearances Sidewall Power Vent Power VentTermination Clearances Sidewall Direct Vent Direct VentWater Heater Installation Condensate Drain InstallationInstallation Notes Installation InstructionsSupply Gas Line Installation Gas Line SizingSupply Gas Line Sizing U. S. Units Supply Gas Line Sizing Metric UnitsSupply Gas Regulator Installation Gas Line Leak TestingGas Line Connection Electrical Wiring Power Supply ConnectionsEnable/Disable Circuit Connecting An External Supervisory ControlWater Piping Diagrams Water Line ConnectionsValve Discharge Pipe Thermometers not SuppliedTemperature Regulation High Temperature Limit Control ECOHigh Temperature Applications Thermostat ControlTank Temperature 103F Operating Set Point 120F Control System OperationOverview Control System NavigationStatus Icons Icon DescriptionOperating States State DescriptionControl System Menus Menu DescriptionUser Settings & Control System Menus Update CancelBack Help Description/Action DisplayChange Back Help Display Settings Description/Action Heater Information Description/Action DisplayBack Advanced View Back HelpECO YESUpdate Service Contact InformationSelect Back Help NameStart Up Prior to Start upInitial Start Up GAS Valve / Venturi Assembly TOP View GAS Valve TOP Detail ViewLighting The Water Heater Gas pressure reading while the water heater is firingMultiple Appliance Installations High Altitude Installations Checking The Firing Rate1050 = 300,000 Btu/hr 87.9 kW To Turn Off GasLighting The Water Heater SUF 60 120 and SUF 100 150 Models onlyLighting & Operation Labels Tank Temperature 103F Operating Set Point 120F SUF 100 199 and SUF 100 250 Models onlyTroubleshooting Installation ChecklistSequence Of Operation Sequence Of Operation Flow Chart Closed by control system Fault Msg is displayedPre-Purge cycle Operational Problems Installation ErrorsRough Starting, Rough Operation Momentary IgnitionFault And Alert Conditions Fault And Alert Messages Possible Causes Check/Repair Displayed Fault/Alert MessageBack Advanced Blower Prover Failure No Anode VoltageMaintenance Maintenance ScheduleGeneral Draining And FlushingFilling The Water Heater Sediment RemovalLime Scale Removal Manual Lime Scale RemovalPowered Anode Rods Drain Valve and Access PanelsTemperature-Pressure Relief Valve Test Vent SystemDiagrams J3 J5J10 J13 J11 CCB Central Control Board LayoutSUF 120 & 150 Wiring Diagram User Interface ModulSUF 199 & 250 Wiring Diagram CCB Central Control BoardCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water State Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty