State Industries SUF-60-120, SUF-100-250 Termination Clearances Sidewall Power Vent

Page 36

Termination Clearances Sidewall Power Vent

 

 

 

 

 

 

POWER VENT

 

 

 

 

 

 

 

 

(using room air for combustion)

 

 

 

 

EXTERIOR CLEARANCES FOR SIDEWALL VENT TERMINATION

 

 

 

 

 

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

D

 

 

 

 

 

A

 

 

 

 

 

H

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

vE

 

 

 

 

 

 

 

 

 

 

 

 

 

L

B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

v

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

 

C

 

B

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

FIXED

 

 

 

 

 

 

 

 

 

 

 

E

 

 

 

 

 

 

V

FIXED

 

V

 

OPERABL

CLOSED

 

M

 

X

 

 

 

 

 

 

 

 

 

 

 

CLOSED

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OPERABL

E

 

 

 

 

X

 

 

 

 

 

 

V

B

 

V

 

 

 

 

 

 

 

F

 

 

 

 

 

 

 

 

 

 

 

 

B

 

J

 

 

 

K

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

 

 

 

V

VENT TERMINAL

X AIR SUPPLY INLET

 

AREA WHERE TERMINAL IS NOT PERMITTED

Figure 48

Vent terminal clearances for “Power Vent” installations. Power Vent configurations use room air for combustion.

 

 

Canadian Installations 1

US Installations 2

 

 

Canadian Installations 1

US Installations 2

 

Clearance above grade,

 

 

 

Clearance to each side

3 feet (91 cm) within a height 15 feet

3 feet (91 cm) within a

A

 

 

H

of center line extended

height 15 feet (4.5 m)

veranda, porch, deck or

12 inches (30 cm)

12 inches (30 cm)

above meter/regulator

(4.5 m) above the meter/

above the meter/regulator

 

balcony

 

 

 

assembly

regulator assembly

assembly*

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6 inches (15 cm) for appliances up to

 

 

 

 

 

 

Clearance to window

10,000 Btu/hr (3 kW), 12 inches (30

4 feet (1.2 m) below

 

Clearance to service

 

 

B

cm) for appliances between 10,000

or to side of opening;

I

 

 

or door that may be

regulator vent outlet

3 feet (91 cm)

3 feet (91 cm)*

Btu/hr (3 kW) and 100,000 Btu/hr (30

1 foot (30 cm) above

 

opened

kW), 36 inches (91 cm) for appliances

opening

 

 

 

 

 

 

 

 

 

 

 

 

above 100,000 Btu/hr (30 kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6 inches (15 cm) for appliances up

 

 

 

 

 

 

Clearance to a non

to 10,000 Btu/hr (3 kW), 12 inches

4 feet (1.2 m) below or to

 

Clearance to

 

 

 

mechanical air supply

(30 cm) for appliances between

C

 

 

J

side of opening; 1 foot

permanently closed

12 inches (30 cm)*

12 inches (30 cm)*

inlet into building or

10,000 Btu/hr (3 kW) and 100,000

(30 cm) above opening.

 

window

 

 

 

combustion air inlet to

Btu/hr (30kW), 36 inches (91cm)

 

 

 

 

 

 

any other appliance

for appliances above 100,000 Btu/

 

 

 

 

 

 

 

hr (30 kW)

 

 

 

 

 

 

 

 

 

 

Vertical clearance to

 

 

 

 

 

 

 

ventilated soffit located

 

 

 

 

 

3 feet (91 cm) above if

 

above the terminal

 

 

 

Clearance to a

 

D

 

 

K

 

within

within a horizontal

12 inches (30 cm)*

12 inches (30 cm)*

mechanical air supply

6 feet (1.83 m)

10 feet (3 m) horizontally

 

distance of 2 feet (61

 

 

 

inlet

 

 

 

cm) from the center line

 

 

 

 

 

 

 

of the terminal

 

 

 

 

 

 

 

 

 

 

 

Clearance above paved

 

 

E

Clearance to

12 inches (30 cm)*

12 inches (30 cm)*

L

sidewalk or paved

7 feet (2.13 m)†

7 feet (2.13 m)

unventilated soffit

driveway located on

 

 

 

 

 

 

public property

 

 

 

 

 

 

 

 

 

 

F

cornerClearance to outside

 

 

M

Clearance under

 

 

2 feet (60 cm)*

2 feet (60 cm)*

veranda, porch, deck, or

12 inches (30 cm) ‡

12 inches (30 cm) ‡

 

 

 

 

 

balcony

 

 

G

cornerClearance to inside

18 inches (45 cm)*

18 inches (45 cm)*

 

 

 

 

1 In accordance with the current CSA B149.1, Natural Gas and Propane Installation Code. 2 In accordance with the current ANSI Z223.1/NFPA 54, National Fuel Gas Code.

A vent shall not terminate directly above a sidewalk or paved driveway that is located between two single family dwellings and serves both dwellings.

‡ Permitted only if veranda, porch, deck, or balcony is fully open on a minimum of two sides beneath the floor.

* Clearance in accordance with local installation codes and the requirements of the gas supplier and the manufacturer’s installation instructions.

36

Image 36
Contents Commercial gas water heaters Table Of Contents Safe Installation, Use and Service ApprovalsGeneral Safety Information PrecautionsHydrogen Gas Flammable Overheated water can cause water tank explosionInstalling, using or servicing Water heater Fire or Explosion HazardFire and Explosion Hazard Preparing For The Installation IntroductionAbbreviations Used QualificationsFeatures And Components Basic OperationWater Heater’s 120 VAC on/off switch Top Views 120,000 & 150,000SUF 120 & 150 Components Top Views SUF 199 & 250 ComponentsWater heaters 24 Volt Gas Valve Left Side Right Side Installation Considerations Rough In DimensionsTOP Views Recovery Capacities Locating The Water HeaterGas Line Connection Size Storage CapacitiesExtended Vent Terminations Optional Concentric TerminationsHard Water Circulation PumpsInstallation Requirements Power SupplyGas Pressure Requirements Supply Gas LineMixing Valves Dishwashing MachinesClosed Water Systems Thermal ExpansionTemperature-Pressure Relief Valve Water Damage HazardValve Discharge Pipe Requirements Condensate Drain Combustible Material StorageContaminated Air Condensate Drain Water TrapBreathing Hazard Carbon Monoxide Gas Air RequirementsUnconfined Space Confined SpaceFresh Air Openings For Confined Spaces Outdoor Air Through Two OpeningsOutdoor Air Through One Opening Outdoor Air Through Two Horizontal DuctsPage Commonwealth of Massachusetts InspectionVenting Installation General Venting InformationGeneral Venting Instructions SUF 199 & SUF 250 Intake Air Connection Correct OrientationLarge Hose Fernco Clamp TEE FittingVenting Requirements Venting Installation Sequence Power Vent InstallationDirect Vent Installation Intake AIR Screen Field SuppliedVertical Termination Installation Standard Factory Supplied TerminationsMaximum Factory Supplied Standard Termination Field Supplied STRAP/SUPPORTIntake AIR AND/OR Vent Exhaust Sidewall Termination Installation Concentric Termination Installation Determine the location for the terminationInch Concentric Termination Installation Inch Concentric Termination KITTWO Concentric Terminations Three Concentric TerminationsFour Concentric Terminations Eight Concentric TerminationsMultiple Concentric Termination Arrangements Two Concentric TerminationsEight Concentric Terminations Sidewall RoofPower Vent Horizontal Venting ArrangementsDirect Vent Horizontal Direct Vent Vertical Vent Horizontal Intake Direct Vent Horizontal Vent Vertical IntakeDirect Vent Horizontal Concentric Termination Clearances Sidewall Power Vent Power VentTermination Clearances Sidewall Direct Vent Direct VentWater Heater Installation Condensate Drain InstallationInstallation Notes Installation InstructionsSupply Gas Line Installation Gas Line SizingSupply Gas Line Sizing U. S. Units Supply Gas Line Sizing Metric UnitsSupply Gas Regulator Installation Gas Line Leak TestingGas Line Connection Electrical Wiring Power Supply ConnectionsEnable/Disable Circuit Connecting An External Supervisory ControlWater Piping Diagrams Water Line ConnectionsValve Discharge Pipe Thermometers not SuppliedTemperature Regulation High Temperature Limit Control ECOHigh Temperature Applications Thermostat ControlTank Temperature 103F Operating Set Point 120F Control System OperationOverview Control System NavigationStatus Icons Icon DescriptionOperating States State DescriptionControl System Menus Menu DescriptionUser Settings & Control System Menus Update CancelBack Help Description/Action DisplayChange Back Help Display Settings Description/Action Heater Information Description/Action DisplayBack Advanced View Back HelpECO YESUpdate Service Contact InformationSelect Back Help NameStart Up Prior to Start upInitial Start Up GAS Valve / Venturi Assembly TOP View GAS Valve TOP Detail ViewLighting The Water Heater Gas pressure reading while the water heater is firingMultiple Appliance Installations High Altitude Installations Checking The Firing Rate1050 = 300,000 Btu/hr 87.9 kW To Turn Off GasLighting The Water Heater SUF 60 120 and SUF 100 150 Models onlyLighting & Operation Labels Tank Temperature 103F Operating Set Point 120F SUF 100 199 and SUF 100 250 Models onlyTroubleshooting Installation ChecklistSequence Of Operation Sequence Of Operation Flow Chart Closed by control system Fault Msg is displayedPre-Purge cycle Operational Problems Installation ErrorsRough Starting, Rough Operation Momentary IgnitionFault And Alert Conditions Fault And Alert Messages Possible Causes Check/Repair Displayed Fault/Alert MessageBack Advanced Blower Prover Failure No Anode VoltageMaintenance Maintenance ScheduleGeneral Draining And FlushingFilling The Water Heater Sediment RemovalLime Scale Removal Manual Lime Scale RemovalPowered Anode Rods Drain Valve and Access PanelsTemperature-Pressure Relief Valve Test Vent SystemDiagrams J3 J5J10 J13 J11 CCB Central Control Board LayoutSUF 120 & 150 Wiring Diagram User Interface ModulSUF 199 & 250 Wiring Diagram CCB Central Control BoardCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water State Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty