Submersible Pump Installation Check List

F. Check insulation resistance as pump/motor assembly is lowered into the well. Resistance may drop gradually as more cable enters the water, but any sudden drop indicates possible cable, splice or motor lead damage; see page 44.

9.After Installation

A. Check all electrical and water line connections and parts before starting the pump.

B. Start the pump and check motor amps and pump delivery. If normal, continue to run the pump until delivery is clear. If three-phase pump delivery is low, it may be running backward. Rotation may be reversed (with power off) by interchanging any two motor lead connections to the power supply.

C. Check three-phase motors for current balance within 5% of average, using motor manufacturer instructions. Imbalance over 5% will cause higher motor temperatures and may cause overload trip, vibration, and reduced life.

D. Verify that starting, running and stopping cause no signifi cant vibration or hydraulic shocks.

E. After at least 15 minutes running time, verify that pump output, electrical input, pumping level, and other characteristics are stable and as specifi ed.

Date _____________________ Filled In By ____________________________________________________

Notes _________________________________________________________________________________________

_______________________________________________________________________________________________

_______________________________________________________________________________________________

_______________________________________________________________________________________________

_______________________________________________________________________________________

_______________________________________________________________________________________

Image 34
Contents Submersible Motors Important Information for Installers of this Equipment Commitment to Quality Page Application Installation Maintenance Manual Submersible MotorsFrequency of Starts Application All MotorsStorage Mounting PositionTransformer Capacity Transformer Capacity Single-Phase or Three-PhaseEffects of Torque Torque Required ExamplesEngine Driven Generators Use of Engine Driven Generators Single-Phase or Three-PhaseUse of Check Valves KVARequired Cooling Flow Water Temperature and FlowFlow Inducer Sleeve MotorHead Loss in Feet Meters at Various Flow Rates Head Loss From Flow Past MotorHot Water Applications Standard Motors Minimum gpm l/m Required for 3 ft/s .91 m/sec Flow RateHot Water Applications Example Service Factor HorsepowerMaximum Water Temperature Heat Factor Multiplier at 3 ft/s .91 m/sec Flow RateGrounding Surge Arrestors Drawdown SealsGrounding Control Boxes and Panels Control Box and Panel EnvironmentWire Motor Solid State Controls Application Single-Phase MotorsWire Control Boxes QD Relays Solid State200 120180 250Two or More Different Cable Sizes Can Be Used Actual Length FormulaSingle-Phase Motor Specifications 60 Hz 3450 rpm Single-Phase Motor Fuse Sizing Buck-Boost Transformers Auxiliary Running CapacitorsBuck-Boost Transformer Sizing Application Three-Phase Motors Three-Phase 60 C Cable 250 400 140 220150 240 450260 150200 250 280Three-Phase 75 C Cable 340 420 120 180130 340 400 490Amps Watts Three-Phase Motor Specifications 60 HzFull Load Maximum Efficiency % Locked Rotor AmpsThree-Phase Motor Fuse Sizing 575KW Volts Amps Watts Efficiency %100 150 200 175 250 225 125 110 300 17.5 Rating Full Load Maximum Efficiency Locked Rotor AmpsDual Element Overload Relays 60 Hz 4 MotorsHeaters for Furnas60 Hz 6 Motors Nema Heaters for AdjustableFootnotes for Tables 28, 29, Submersible Pump Installation Check List Date Filled In By Motor PumpControl Panel Power SupplyTransformers Incoming VoltageInstallation Controls and Protective DevicesVoltage To Motor Insulation CheckAmps To Motor Recommended Adjustable Overload Relays 60 Hz 8 MotorsKVAR Required 60 Hz SubMonitor Three-Phase ProtectionPower Factor Correction Motor Kvar Required for PFThree-Phase Starter Diagrams Line Voltage ControlThree-Phase Power Unbalance Checking and Correcting Rotation and Current UnbalanceThree-Phase Motor Lead Identification Phase ConvertersReduced Voltage Starters Inline Booster Pump SystemsFeed Water Temperature C AIR Franklin Cable chart See 12. WiringSource of Cable Ampacity Availability Variable Speed Submersible Pump Operation, Inverter Drives Installation All Motors Dimensions Standard Water WellShaft Height and Free End Play Tightening Motor Lead Connector Jam NutPump to Motor Coupling Submersible Leads and CablesMotor Does Not Start Maintenance All MotorsSystem Troubleshooting Motor Starts Too OftenMotor Runs Continuously Motor Runs But Overload Protector TripsPreliminary Tests All Sizes Single- and Three-Phase ResistanceResistance of Drop Cable ohms Insulation Resistance ReadingsNormal ohm and Megohm Values Between All Leads and Ground Single-Phase Control Boxes Checking and Repairing Procedures Power OnQD, Solid State Control Box Power Off Ohmmeter TestsOverload Kits 60 Hz QD Relay Replacement Kits QD Capacitor Replacement KitsQD Control Box Parts 60 Hz Control BOX Model no Capacitors MFD Volts Integral Horsepower Control Box Parts 60 HzOverload Relay Integral hp Voltage Relay Replacement Kits Integral hp Capacitor Replacement KitsIntegral hp Overload Replacement Kits Integral hp Contactor Replacement KitsControl Box Wiring Diagrams 1 hp QD RelayHp Standard Hp Deluxe 282 201 Hp X-LARGE Pumptec-Plus Maintenance Electronic ProductsPumptec-Plus Troubleshooting During Installation Unit Appears DeadPumptec-Plus Troubleshooting After Installation QD Pumptec & Pumptec Troubleshooting QD Pumptec and PumptecSubDrive/MonoDrive Troubleshooting SubDrive75, 150, 300, MonoDrive, & MonoDrive XTSubMonitor Troubleshooting SubMonitorSubtrol-Plus Obsolete See SubMonitor Subtrol-Plus Troubleshooting After InstallationGreen Off Time Light on Abbreviations IgbtPage Page Page Toll Free Help from a Friend