Mitsubishi Electronics TG-2000A 2 G-50A data collection Step, Unit composition set-up Step

Page 32

8.6.2 G-50A data collection (Step 1)

It is possible to collect the system information (group information, interlocking ventilation unit setting information, etc.) set for the G-50A with the integrated centralzed control software TG-2000A during the initial setting.

Caution:

Note that using the G-50A data collecting function may cause the system information possessed in the TG -2000A to be completely cleared. When the information is collected, execute the initial setting again as it is written over the G-50A information.

It can only collect the information when all the G-50A units are connected.

It is recommended to execute this function after the test operation of the air conditioner and the G-50A have been completed normally.

Collect the information from the G-50A during the initial setting.

[Procedure]

1)Select the [Collecting of information from G-50] button.

To collect the system information from the G-50A during the initial setting, click the [Collecting of information from G-50] button.

After completing the information collecting, the opera- tion advances automatically to the next step. Wait a moment, as it takes time for information collecting.

*When the [Cancel] button is clicked, this setting is terminated to return to the initial screen.

G-50A Data collection screen

Skip the collecting information from the G-50A. [Procedure]

1)Select the [Next] button.

If it is not necessary to collect the informat ion, click the [Next] button.

8.6.3 Unit composition set-up (Step 2)

It is possible to confirm and change the configuration of the unit in each G-50A .

G-50A Selection:

Selected unit icon:

Displays the icons (symbols)

Select the G-50 No.

such as the indoor unit, outdoor

 

unit, remote controller, system

 

remote controller, etc. and their

 

names.

Unit configura-

 

tion table:

 

Displays the system

 

configuration unit of

 

the G-50 concerned.

 

Unit configuration address setting

 

Confirm the unit configuration.

 

[Procedure]

 

1)Select the G-50 No. with the “￿ /￿“ buttons.

In this case, use the “ ￿/￿“ buttons to select the G-50A No. desired to confirm the unit configuration.

2)Select the [OK] button after checking the unit configuration of each G-50A .

If it is not necessary to change the unit configuration of each G-50A when it is checked, click the [OK] button. *When the [Cancel] button is clicked, this setting is terminated to return to the initial window.

29

Image 32
Contents Please read this manual before using the unit Please keep this manual for future useContents Page Do not use with other applications Safety PrecautionsOther machines ¡ *1 System Requirements Requirements system recommendationsCompatible Units Restrictions RestrictionsNumber of units Other Devices M e Manufacturer ModelSystem Configuration System Configuration Example Hardware Connection DiagramFlow of Site Adjustment Tools for Site AdjustmentPC connections and settings 50A test runTest operation from centralized controller G-50A D e l s IP address rangePage Installation G-2000A SetupPreparing for installation Steps Action Details How toRunning TG-2000A Setup New setup Msde setupDatabase setup When the installation is completed, restart the computerCheck the installation folder Installation start confirmationTG-2000A setup completion Read the license agreementMsde uninstall G-2000A UninstallTG-2000A uninstall Part Names and Functions Window Elements Accessing Functions and Moving between Windows Basic Mouse OperationShift from the initial window to the control window Shift from the control window to the initial windowPage Page User Set -up Set TG -2000A functions Page Page Initial Startup and Shutdown Before Startup StartupShutting down the OS ShutdownTG-2000A Shutdown System Setting Procedure System Setting Screen System Setting ProcedureUser Set-up General OperationConnection Setting Reliability FunctionEnergy Monitoring Related Site Name Set-upPage Setting Procedure and Restrictions G-50 Connection Set-upNumber of G-50A se t-up Step IP address of G-50A se t-up StepSystem Configuration Set-up Monitor the optional functions being used. Procedure2 G-50A data collection Step Unit composition set-up StepChange the unit configuration. Procedure Icon Name Address rangeSe t-up of refrigerant system Step Set-up of group Step Interlocked setting Step Change the group No. ProcedureInterlocking ventilation unit Interlocking destination un-set unitSet-up of model name Step Configuration Procedure and RestrictionsMonitoring Screen Set-up Set-up of the number of floors, and floor name Step Creation of a plane view Step Set-up of floor name and G -50Set-up of icon arrange and name Step Floor Selection Display ButtonSet the group icons on each floor and set their names Group ListSet the block groups. Procedure Deleting block settingsSet-up of block Step Name Change button Block Set button Release buttonChanging the block name Setting Procedures and Restrictions Check before WHM setup. ProcedureModel Baud rate Parity Stop bit Set Charge System options. Procedure Energy Monitoring S e t-upDivision mode Step Division mode for outdoor unitDivision mode for indoor unit Proportiona l division reference dataSelect the OC icon, and click on the selected outdoor unit Delete Watt Hour Meter RelationshipsDeleting Watt Hour Meter Relationships Relation between indoor units and watt hour meters StepSet the Indoor Unit and Watt Hour Meter Relationship Set the charge blocks. Procedure Charge Blocks StepAdd charge blocks Delete the charge blockRelease a block from charge blocks Selecting a Currency from the Display Procedure Manually Setting the CurrencyExit the Currency Settings Set the electric power rate schedule. ProcedureSet the standard charge . Procedure 10Standard charge set StepTime Set-up Function ContentsSet the date/time . Procedure Monitor the time Monitor buttonPassword S e t-up Change the passwordNo repair is required Overview Remarks Maintenance of Charge Data Preparing for Charging Data MaintenanceMaintenance Methods and Restrictions Display the Maintenance screen. ProcedureUnit Data Maintenance Maintaining Apportioned Unit DataCorrection method Maintenance example Watt Hour Meter Data Maintenance Maintaining watt hour Meter Data ProcedureDescription of function Watt hour Meter Monitor Function ProcedureOperation Amount Data Monitoring Monitor the data for the last day after Charge Parameter OutputMonitoring operation amount data Performing charging remedy Charging RemedyOutput file data format Preparing to perform charging remedy PreparationRemedial apportioning setting screen Apportioning integrated Remark InterValRemedial apportioning confirmation screen Calculating screen Remedy when personal computer HDD fails no backup Remedy when personal computer HDD fails backup Day before recovery day Apportioning method when computer crashes Remedy when watt hour meter fails monitoring impossible Integrate d Remedy for system information setting error Total air-conditioning charge including that Error Code List Air-conditioning unit error codesPage Page System error codes Detail of function Setting Check ListSetting item Case Test Run Check Test run check sheetLRC Date Tester Test item Comment Charging Test Run CheckCharging No WHM connection Test Run Check Page Capacity Division mode Charge setting SettingCheck Within Outside TotalExample 1100 conditioner 1300 Outside Within 12001400 Page Page WHM1 WHM2 WHM3 WHM4 WHM5 WHM6 Memo Appendix 1 Installing Windows XP Professional Setup ProcedurePreparing for Se tup What you needPage Windows Appendix 2 Auto Log-in Confirmation MethodWindows XP Page WT03901X01