9.5.2 Remedial apportioning setting screen
(1)Check the items necessary for remedial apportioning.
When charging is not apportioned, the charging data is destroyed, etc., the
The items which must be set depend on the assumed case and the charging configuration. The table below shows which setting items are required and are not required.
Assumed case
Charging configuration
Settlement- Total air -
term | charge |
Standard charge
Remedial | Power |
apportioning integrated Remark
interVal | Value |
|
| |
HDD failure | 1 system | |
(no backup) | Multiple systems | |
|
| |
HDD failure | 1 system | |
(backup) |
| |
Multiple systems | ||
| ||
|
| |
Computer crash | 1 system | |
|
| |
| Multiple systems | |
Watt hour meter | 1 system | |
failure (Monitoring |
| |
Multiple systems | ||
i m p o s s i b l e ) | ||
| ||
|
| |
System information | 1 system | |
setting error |
| |
Multiple systems | ||
| ||
|
|
|
|
|
|
|
| |
V |
| V *1 | V | V | See sec. | |
V | V | V *1 | V | V | 9.5.3 | |
|
|
|
|
|
| |
V |
| V *1 | V |
| See sec. | |
|
|
|
|
| 9.5.4 | |
V | V | V *1 | V |
| ||
|
| |||||
|
|
|
|
|
| |
V |
| V *1 | V |
| See sec. | |
|
|
|
|
| 9.5.5 | |
V | V | V *1 | V |
| ||
|
| |||||
V |
| V *1 | V | V *2 | See sec. | |
|
|
|
|
| 9.5.6 | |
V | V | V *1 | V | V *2 | ||
| ||||||
|
|
|
|
|
| |
V |
| V *1 | V | V *2 | See sec. | |
|
|
|
|
| 9.5.7 | |
V | V | V *1 | V | V *2 | ||
| ||||||
|
|
|
|
|
|
V shows that the item must be set.
*1 When the settlement
*2 The power integrated Value may haVe to be set depending on the failure cause or the contents of the setting error.
(2)Set the remedial apportioning setting items.
[Procedure]
1)Click [Remedial apportioning setting] button. Click the [Remedial apportioning] button in the initial window. The remedial apportioning setting screen appears.
2)Set the apportioning interval (Calculation).
Use click and the “/” buttons to set the interval to be calculated by this remedial apportioning. An interval from the previous day to the past 122 days can be set.
3)Set the total
Set the settlement
*Numbers can be manually input.
4)Select the standard charge setting.
When the
5)Set the remedial apportioning interval.
Use click and the “/ ” buttons to set the remedial interval dates.
6)Set the power integrated value.
Displays the power integrated value at 00:00 hours of the remedial apportioning start day. (The integrated value at 24:00 hours of the previous day.) Select the field of the watt hour meter you want to change with the mouse and set or change the power integrated value. The integrated value field of the selected watt hour meter changes to a blue cell. When the integrated value data changes, the new data is displayed in blue.
64