Mitsubishi Electronics TG-2000A operation manual Total air-conditioning charge including that

Page 76

4)Settlement -of-accounts term setting

Set the settlement-of-accounts term (start day and end day) at the remedial apportioning setting screen. The initial value is the settlement-of-accounts term of the last month.

5)Total air-conditioning charge setting

Set the total air-conditioning charge for the settlement- of-accounts term.

Note:

When the settlement-of-accounts term is one

month and includes a standard charge, set the

Remedial apportioning setting window

total air-conditioning charge including that

 

standard charge.

 

When there is one power charge, the total air-conditioning charge does not have to be set. This item appears in gray.

6)Include/Not include standard charge setting

When the settlement-of-accounts term is one month, [Include] or [Not include] standard charge can be selected. Set whether or not the standard charge is to be included.

7)Remedial interval setting

Set the remedial apportioning interval. The remedial start day is the settlement-of-accounts day and the remedial end day is the system setting error recovery day.

Note:

“Recovery day” is the day the system recovered from a system setting error and normal operation started.

8)Watt hour meter integrated value setting

The value at 24:00 hours of the day before the count start day is displayed in the watt hour meter integrated value of each watt hour meter.

Setting error: When watt hour meter and unit wiring connection match The watt hour meter integrated value does not have to be corrected.

Failure cause: When watt hour meter and unit wiring connection is wrong

Refer to the indoor unit operation amount and calculate and study the remedial interval power consumption for each watt hour meter. Only the watt hour meters where the watt hour meter and unit wiring connection is wrong have to be studied.

Note:

The watt hour meter integrated value for each date can be displayed by changing the remedial apportioning start day.

The day before the failure day must be charge apportioned normally.

The indoor unit operation amount can also be referenced in watt hour meter integrated value calculation and study. It is recommended that the calculation method suited to the system conditions be used.

When the calculated watt hour meter integrated value is a negative value, set the value calculated integrated value + watt hour meter maximum integrat ed value + minimum

When setting of the remedial apportioning screen is complete, perform Section 9.5.2 “(3) Calculate remedial apportioning” .

73

Image 76
Contents Please read this manual before using the unit Please keep this manual for future useContents Page Other machines Safety PrecautionsDo not use with other applications Compatible Units System Requirements Requirements system recommendations¡ *1 Number of units RestrictionsRestrictions Other Devices M e Manufacturer ModelSystem Configuration System Configuration Example Hardware Connection DiagramFlow of Site Adjustment Tools for Site AdjustmentPC connections and settings 50A test runTest operation from centralized controller G-50A D e l s IP address rangePage Installation G-2000A SetupPreparing for installation Steps Action Details How toRunning TG-2000A Setup New setup Msde setupDatabase setup When the installation is completed, restart the computerCheck the installation folder Installation start confirmationTG-2000A setup completion Read the license agreementTG-2000A uninstall G-2000A UninstallMsde uninstall Part Names and Functions Window Elements Accessing Functions and Moving between Windows Basic Mouse OperationShift from the initial window to the control window Shift from the control window to the initial windowPage Page User Set -up Set TG -2000A functions Page Page Initial Startup and Shutdown Before Startup StartupTG-2000A Shutdown ShutdownShutting down the OS System Setting Procedure System Setting Screen System Setting ProcedureUser Set-up General OperationConnection Setting Reliability FunctionEnergy Monitoring Related Site Name Set-upPage Setting Procedure and Restrictions G-50 Connection Set-upNumber of G-50A se t-up Step IP address of G-50A se t-up StepSystem Configuration Set-up Monitor the optional functions being used. Procedure2 G-50A data collection Step Unit composition set-up StepChange the unit configuration. Procedure Icon Name Address rangeSe t-up of refrigerant system Step Set-up of group Step Interlocked setting Step Change the group No. ProcedureInterlocking ventilation unit Interlocking destination un-set unitMonitoring Screen Set-up Configuration Procedure and RestrictionsSet-up of model name Step Set-up of the number of floors, and floor name Step Creation of a plane view Step Set-up of floor name and G -50Set-up of icon arrange and name Step Floor Selection Display ButtonSet the group icons on each floor and set their names Group ListSet the block groups. Procedure Deleting block settingsSet-up of block Step Name Change button Block Set button Release buttonChanging the block name Setting Procedures and Restrictions Check before WHM setup. ProcedureModel Baud rate Parity Stop bit Set Charge System options. Procedure Energy Monitoring S e t-upDivision mode Step Division mode for outdoor unitDivision mode for indoor unit Proportiona l division reference dataSelect the OC icon, and click on the selected outdoor unit Delete Watt Hour Meter RelationshipsSet the Indoor Unit and Watt Hour Meter Relationship Relation between indoor units and watt hour meters StepDeleting Watt Hour Meter Relationships Set the charge blocks. Procedure Charge Blocks StepRelease a block from charge blocks Delete the charge blockAdd charge blocks Selecting a Currency from the Display Procedure Manually Setting the CurrencyExit the Currency Settings Set the electric power rate schedule. ProcedureSet the standard charge . Procedure 10Standard charge set StepSet the date/time . Procedure Function ContentsTime Set-up Monitor the time Monitor buttonPassword S e t-up Change the passwordNo repair is required Overview Remarks Maintenance of Charge Data Preparing for Charging Data MaintenanceMaintenance Methods and Restrictions Display the Maintenance screen. ProcedureUnit Data Maintenance Maintaining Apportioned Unit DataCorrection method Maintenance example Watt Hour Meter Data Maintenance Maintaining watt hour Meter Data ProcedureOperation Amount Data Monitoring Watt hour Meter Monitor Function ProcedureDescription of function Monitoring operation amount data Charge Parameter OutputMonitor the data for the last day after Output file data format Charging RemedyPerforming charging remedy Preparing to perform charging remedy PreparationRemedial apportioning setting screen Apportioning integrated Remark InterValRemedial apportioning confirmation screen Calculating screen Remedy when personal computer HDD fails no backup Remedy when personal computer HDD fails backup Day before recovery day Apportioning method when computer crashes Remedy when watt hour meter fails monitoring impossible Integrate d Remedy for system information setting error Total air-conditioning charge including that Error Code List Air-conditioning unit error codesPage Page System error codes Setting item Case Setting Check ListDetail of function Test Run Check Test run check sheetLRC Date Tester Charging No WHM connection Test Run Check Charging Test Run CheckTest item Comment Page Capacity Division mode Charge setting SettingCheck Within Outside TotalExample 1100 conditioner 1300 Outside Within 12001400 Page Page WHM1 WHM2 WHM3 WHM4 WHM5 WHM6 Memo Appendix 1 Installing Windows XP Professional Setup ProcedurePreparing for Se tup What you needPage Windows XP Appendix 2 Auto Log-in Confirmation MethodWindows Page WT03901X01