Mitsubishi Electronics TG-2000A Interlocked setting Step, Change the group No. Procedure

Page 36

Note:

This group setting screen displays the number of management groups and number of indoor units for the system controller (GR, SR, AN, SC) limited when the group is newly organized.

It is possible to use the group organization as it is, which is collected from the G-50A . On/off controller (AN), etc., for instance

Change the group No. [Procedure]

1)Select the cell of the group No. displayed.

Click the cell desired to change the group No., and the group No. change screen is displayed.

2)Change the group No.

Use the keyboard to input the group No. to change.

3)Select the [OK] button.

Click the [OK] button after changing the group No. If there is a duplicated group No., an error message is displayed.

8.6.6 Interlocked setting (Step 5)

It is possible to confirm and change the information of ventilation unit interlocked with indoor unit in each G-50A .

G-50A selection:

Select the G-50 No.

Interlocking ventilation unit:

Displays the ventila- tion unit (LC, FU) to interlock.

Interlocking destination un-set unit:

Displays the indoor unit (IC, AIC) to which interlocking is not set.

Confirm the ventilation unit inte rlocking set-up information. [Procedure]

1)Select the No. of G-50 with “/ ” button.

In this case, select the No. of G-50A to confirm the ventilation unit interlocking set-up information with the “/ ” button.

2)Select the [OK] button after confirming the ventilation unit interlocking information.

If it is not necessary to change or correct the information of each G-50A when it is checked, click t he [OK] button.

*When the [Cancel] button is clicked, this setting is terminated to return to the initial window.

Change the ventilation unit interlocking set-up information. [Procedure]

1)Select the No. of G-50 with “/ ” button.

In this case, select the No. of G-50A to change the ventilation unit interlocking setting with the “/ ” button.

2)Delete/add the unit icon.

Unit icon deletion:Click the unit icon to be deleted.

Unit icon addition:Click the unit icon to be added, from the Interlocking destination un-set unit columns to set it to the selected state.

(The symbol of the selected unit is displayed by the pointer.) When the interlocking ventilation unit display line to be added is clicked, the unit icon is displayed.

33

Image 36
Contents Please read this manual before using the unit Please keep this manual for future useContents Page Safety Precautions Other machinesDo not use with other applications System Requirements Requirements system recommendations Compatible Units¡ *1 Restrictions Number of unitsRestrictions Other Devices M e Manufacturer ModelSystem Configuration System Configuration Example Hardware Connection DiagramFlow of Site Adjustment Tools for Site AdjustmentPC connections and settings 50A test runTest operation from centralized controller G-50A D e l s IP address rangePage Installation G-2000A SetupPreparing for installation Steps Action Details How toRunning TG-2000A Setup New setup Msde setupDatabase setup When the installation is completed, restart the computerCheck the installation folder Installation start confirmationTG-2000A setup completion Read the license agreementG-2000A Uninstall TG-2000A uninstallMsde uninstall Part Names and Functions Window Elements Accessing Functions and Moving between Windows Basic Mouse OperationShift from the initial window to the control window Shift from the control window to the initial windowPage Page User Set -up Set TG -2000A functions Page Page Initial Startup and Shutdown Before Startup StartupShutdown TG-2000A ShutdownShutting down the OS System Setting Procedure System Setting Screen System Setting ProcedureUser Set-up General OperationConnection Setting Reliability FunctionEnergy Monitoring Related Site Name Set-upPage Setting Procedure and Restrictions G-50 Connection Set-upNumber of G-50A se t-up Step IP address of G-50A se t-up StepSystem Configuration Set-up Monitor the optional functions being used. Procedure2 G-50A data collection Step Unit composition set-up StepChange the unit configuration. Procedure Icon Name Address rangeSe t-up of refrigerant system Step Set-up of group Step Interlocked setting Step Change the group No. ProcedureInterlocking ventilation unit Interlocking destination un-set unitConfiguration Procedure and Restrictions Monitoring Screen Set-upSet-up of model name Step Set-up of the number of floors, and floor name Step Creation of a plane view Step Set-up of floor name and G -50Set-up of icon arrange and name Step Floor Selection Display ButtonSet the group icons on each floor and set their names Group ListSet the block groups. Procedure Deleting block settingsSet-up of block Step Name Change button Block Set button Release buttonChanging the block name Setting Procedures and Restrictions Check before WHM setup. ProcedureModel Baud rate Parity Stop bit Set Charge System options. Procedure Energy Monitoring S e t-upDivision mode Step Division mode for outdoor unitDivision mode for indoor unit Proportiona l division reference dataSelect the OC icon, and click on the selected outdoor unit Delete Watt Hour Meter RelationshipsRelation between indoor units and watt hour meters Step Set the Indoor Unit and Watt Hour Meter RelationshipDeleting Watt Hour Meter Relationships Set the charge blocks. Procedure Charge Blocks StepDelete the charge block Release a block from charge blocksAdd charge blocks Selecting a Currency from the Display Procedure Manually Setting the CurrencyExit the Currency Settings Set the electric power rate schedule. ProcedureSet the standard charge . Procedure 10Standard charge set StepFunction Contents Set the date/time . ProcedureTime Set-up Monitor the time Monitor buttonPassword S e t-up Change the passwordNo repair is required Overview Remarks Maintenance of Charge Data Preparing for Charging Data MaintenanceMaintenance Methods and Restrictions Display the Maintenance screen. ProcedureUnit Data Maintenance Maintaining Apportioned Unit DataCorrection method Maintenance example Watt Hour Meter Data Maintenance Maintaining watt hour Meter Data ProcedureWatt hour Meter Monitor Function Procedure Operation Amount Data MonitoringDescription of function Charge Parameter Output Monitoring operation amount dataMonitor the data for the last day after Charging Remedy Output file data formatPerforming charging remedy Preparing to perform charging remedy PreparationRemedial apportioning setting screen Apportioning integrated Remark InterValRemedial apportioning confirmation screen Calculating screen Remedy when personal computer HDD fails no backup Remedy when personal computer HDD fails backup Day before recovery day Apportioning method when computer crashes Remedy when watt hour meter fails monitoring impossible Integrate d Remedy for system information setting error Total air-conditioning charge including that Error Code List Air-conditioning unit error codesPage Page System error codes Setting Check List Setting item CaseDetail of function Test Run Check Test run check sheetLRC Date Tester Charging Test Run Check Charging No WHM connection Test Run CheckTest item Comment Page Capacity Division mode Charge setting SettingCheck Within Outside TotalExample 1100 conditioner 1300 Outside Within 12001400 Page Page WHM1 WHM2 WHM3 WHM4 WHM5 WHM6 Memo Appendix 1 Installing Windows XP Professional Setup ProcedurePreparing for Se tup What you needPage Appendix 2 Auto Log-in Confirmation Method Windows XPWindows Page WT03901X01