Mitsubishi Electronics TG-2000A operation manual Password S e t-up, Change the password

Page 55

8 . 11 Password S e t-up

The initialization password and maintenance password can be changed.

Change the password.

 

 

[Procedure]

 

 

1)

Click [Password set -up] button.

 

 

 

 

Click the [Password change] button at the Initial

 

 

 

window user setup group. The New password

 

 

 

set -up window appears.

 

 

2)

Select the target to be changed.

 

 

 

 

Click and select the target to be changed.

 

 

 

(Password type)

 

 

 

• Initialization password (System administra-

 

 

 

tor password)

 

 

 

• Maintenance password (Maintenance user

 

 

 

password)

 

 

3)

Enter the password at New password.

 

 

 

 

Set the password at New password.

 

 

4)

Enter the password for verification.

 

New password set-up window

 

 

When a new password was set at Step 2), set

 

 

 

the same password for verification.

5)Click [OK] button after finishing the setting.

Check the display contents and click the [OK] button.

*When the [Cancel] button is clicked, this setting is terminated to return to the initial screen.

Maintenance tip

Always memorize the new password. If you forget the password, you cannot open the Initial window.

Note:

When the Initial window is opened by initialization password, the Initialization and Maintenance passwords can be changed at the Password change window.

When the Initial window is opened by maintenance password, only the Maintenance password can be changed at the New password set -up screen.

52

Image 55
Contents Please keep this manual for future use Please read this manual before using the unitContents Page Other machines Safety PrecautionsDo not use with other applications Compatible Units System Requirements Requirements system recommendations¡ *1 Number of units RestrictionsRestrictions M e Manufacturer Model Other DevicesHardware Connection Diagram System Configuration System Configuration Example50A test run Flow of Site AdjustmentTools for Site Adjustment PC connections and settingsD e l s IP address range Test operation from centralized controller G-50APage Steps Action Details How to InstallationG-2000A Setup Preparing for installationWhen the installation is completed, restart the computer Running TG-2000A Setup New setupMsde setup Database setupRead the license agreement Check the installation folderInstallation start confirmation TG-2000A setup completionTG-2000A uninstall G-2000A UninstallMsde uninstall Part Names and Functions Window Elements Shift from the control window to the initial window Accessing Functions and Moving between WindowsBasic Mouse Operation Shift from the initial window to the control windowPage Page User Set -up Set TG -2000A functions Page Page Startup Initial Startup and Shutdown Before StartupTG-2000A Shutdown ShutdownShutting down the OS System Setting Procedure System Setting Procedure System Setting ScreenGeneral Operation User Set-upReliability Function Connection SettingSite Name Set-up Energy Monitoring RelatedPage IP address of G-50A se t-up Step Setting Procedure and RestrictionsG-50 Connection Set-up Number of G-50A se t-up StepMonitor the optional functions being used. Procedure System Configuration Set-upUnit composition set-up Step 2 G-50A data collection StepIcon Name Address range Change the unit configuration. ProcedureSe t-up of refrigerant system Step Set-up of group Step Interlocking destination un-set unit Interlocked setting StepChange the group No. Procedure Interlocking ventilation unitMonitoring Screen Set-up Configuration Procedure and RestrictionsSet-up of model name Step Set-up of the number of floors, and floor name Step Set-up of floor name and G -50 Creation of a plane view StepGroup List Set-up of icon arrange and name StepFloor Selection Display Button Set the group icons on each floor and set their namesName Change button Block Set button Release button Set the block groups. ProcedureDeleting block settings Set-up of block StepChanging the block name Check before WHM setup. Procedure Setting Procedures and RestrictionsModel Baud rate Parity Stop bit Energy Monitoring S e t-up Set Charge System options. ProcedureProportiona l division reference data Division mode StepDivision mode for outdoor unit Division mode for indoor unitDelete Watt Hour Meter Relationships Select the OC icon, and click on the selected outdoor unitSet the Indoor Unit and Watt Hour Meter Relationship Relation between indoor units and watt hour meters StepDeleting Watt Hour Meter Relationships Charge Blocks Step Set the charge blocks. ProcedureRelease a block from charge blocks Delete the charge blockAdd charge blocks Set the electric power rate schedule. Procedure Selecting a Currency from the Display ProcedureManually Setting the Currency Exit the Currency Settings 10Standard charge set Step Set the standard charge . ProcedureSet the date/time . Procedure Function ContentsTime Set-up Monitor button Monitor the timeChange the password Password S e t-upNo repair is required Overview Remarks Display the Maintenance screen. Procedure Maintenance of Charge DataPreparing for Charging Data Maintenance Maintenance Methods and RestrictionsMaintaining Apportioned Unit Data Unit Data MaintenanceCorrection method Maintenance example Maintaining watt hour Meter Data Procedure Watt Hour Meter Data MaintenanceOperation Amount Data Monitoring Watt hour Meter Monitor Function ProcedureDescription of function Monitoring operation amount data Charge Parameter OutputMonitor the data for the last day after Output file data format Charging RemedyPerforming charging remedy Preparation Preparing to perform charging remedyApportioning integrated Remark InterVal Remedial apportioning setting screenRemedial apportioning confirmation screen Calculating screen Remedy when personal computer HDD fails no backup Remedy when personal computer HDD fails backup Day before recovery day Apportioning method when computer crashes Remedy when watt hour meter fails monitoring impossible Integrate d Remedy for system information setting error Total air-conditioning charge including that Air-conditioning unit error codes Error Code ListPage Page System error codes Setting item Case Setting Check ListDetail of function Test run check sheet Test Run CheckLRC Date Tester Charging No WHM connection Test Run Check Charging Test Run CheckTest item Comment Page Capacity Total Division mode Charge settingSetting Check Within OutsideExample 1100 conditioner 1300 Outside Within 12001400 Page Page WHM1 WHM2 WHM3 WHM4 WHM5 WHM6 Memo What you need Appendix 1 Installing Windows XP ProfessionalSetup Procedure Preparing for Se tupPage Windows XP Appendix 2 Auto Log-in Confirmation MethodWindows Page WT03901X01