Mitsubishi Electronics TG-2000A operation manual

Page 11

4.5Step 3: Test operation from integrated centralized control software TG-2000A

Perform the test operation from the integrated centralized control software TG-2000A to check the operation state and monitor display of the air conditioner.

For the operation procedure, refer to the Instruction Manual (Management).

Note:

For confirmation in the test operation, use the checklist shown in Chapter 11.

Perform the normal operation from the integrated centralized control software TG -2000A to execute the test operation/confirmation. (The test operation function is not included in the start/stop function.)

8

Image 11
Contents Please keep this manual for future use Please read this manual before using the unitContents Page Do not use with other applications Safety PrecautionsOther machines ¡ *1 System Requirements Requirements system recommendationsCompatible Units Restrictions RestrictionsNumber of units M e Manufacturer Model Other DevicesHardware Connection Diagram System Configuration System Configuration Example50A test run Flow of Site AdjustmentTools for Site Adjustment PC connections and settingsD e l s IP address range Test operation from centralized controller G-50APage Steps Action Details How to InstallationG-2000A Setup Preparing for installationWhen the installation is completed, restart the computer Running TG-2000A Setup New setupMsde setup Database setupRead the license agreement Check the installation folderInstallation start confirmation TG-2000A setup completionMsde uninstall G-2000A UninstallTG-2000A uninstall Part Names and Functions Window Elements Shift from the control window to the initial window Accessing Functions and Moving between WindowsBasic Mouse Operation Shift from the initial window to the control windowPage Page User Set -up Set TG -2000A functions Page Page Startup Initial Startup and Shutdown Before StartupShutting down the OS ShutdownTG-2000A Shutdown System Setting Procedure System Setting Procedure System Setting ScreenGeneral Operation User Set-upReliability Function Connection SettingSite Name Set-up Energy Monitoring RelatedPage IP address of G-50A se t-up Step Setting Procedure and RestrictionsG-50 Connection Set-up Number of G-50A se t-up StepMonitor the optional functions being used. Procedure System Configuration Set-upUnit composition set-up Step 2 G-50A data collection StepIcon Name Address range Change the unit configuration. ProcedureSe t-up of refrigerant system Step Set-up of group Step Interlocking destination un-set unit Interlocked setting StepChange the group No. Procedure Interlocking ventilation unitSet-up of model name Step Configuration Procedure and RestrictionsMonitoring Screen Set-up Set-up of the number of floors, and floor name Step Set-up of floor name and G -50 Creation of a plane view StepGroup List Set-up of icon arrange and name StepFloor Selection Display Button Set the group icons on each floor and set their namesName Change button Block Set button Release button Set the block groups. ProcedureDeleting block settings Set-up of block StepChanging the block name Check before WHM setup. Procedure Setting Procedures and RestrictionsModel Baud rate Parity Stop bit Energy Monitoring S e t-up Set Charge System options. ProcedureProportiona l division reference data Division mode StepDivision mode for outdoor unit Division mode for indoor unitDelete Watt Hour Meter Relationships Select the OC icon, and click on the selected outdoor unitDeleting Watt Hour Meter Relationships Relation between indoor units and watt hour meters StepSet the Indoor Unit and Watt Hour Meter Relationship Charge Blocks Step Set the charge blocks. ProcedureAdd charge blocks Delete the charge blockRelease a block from charge blocks Set the electric power rate schedule. Procedure Selecting a Currency from the Display ProcedureManually Setting the Currency Exit the Currency Settings10Standard charge set Step Set the standard charge . ProcedureTime Set-up Function ContentsSet the date/time . Procedure Monitor button Monitor the timeChange the password Password S e t-upNo repair is required Overview Remarks Display the Maintenance screen. Procedure Maintenance of Charge DataPreparing for Charging Data Maintenance Maintenance Methods and RestrictionsMaintaining Apportioned Unit Data Unit Data MaintenanceCorrection method Maintenance example Maintaining watt hour Meter Data Procedure Watt Hour Meter Data MaintenanceDescription of function Watt hour Meter Monitor Function ProcedureOperation Amount Data Monitoring Monitor the data for the last day after Charge Parameter OutputMonitoring operation amount data Performing charging remedy Charging RemedyOutput file data format Preparation Preparing to perform charging remedyApportioning integrated Remark InterVal Remedial apportioning setting screenRemedial apportioning confirmation screen Calculating screen Remedy when personal computer HDD fails no backup Remedy when personal computer HDD fails backup Day before recovery day Apportioning method when computer crashes Remedy when watt hour meter fails monitoring impossible Integrate d Remedy for system information setting error Total air-conditioning charge including that Air-conditioning unit error codes Error Code ListPage Page System error codes Detail of function Setting Check ListSetting item Case Test run check sheet Test Run CheckLRC Date Tester Test item Comment Charging Test Run CheckCharging No WHM connection Test Run Check Page Capacity Total Division mode Charge settingSetting Check Within OutsideExample 1100 conditioner 1300 Outside Within 12001400 Page Page WHM1 WHM2 WHM3 WHM4 WHM5 WHM6 Memo What you need Appendix 1 Installing Windows XP ProfessionalSetup Procedure Preparing for Se tupPage Windows Appendix 2 Auto Log-in Confirmation MethodWindows XP Page WT03901X01