Mitsubishi Electronics TG-2000A operation manual Day before recovery day

Page 71

 

 

Preceding month’s count end day.

4) Operation amount backup monitoring

 

 

 

Monitor backup of the operation amount from the backup

Day before recovery day

day to the recovery day. Set the start day as the backup

 

day and the end day as the day before recovery day.

 

Start day

Backup

Failure

Recovery

Now End day

 

¢

ê

ó

˜

 

 

 

Monitor interval

 

Count (1 month)

 

Current value

Operation amount data monitoring screen

Note:

Operation amount data backup monitoring for the failure day is also possible.

Since the operation amount data is the integrated value, the data for the back-up day must also be monitored.

5)Wait until the day after the settlement -of-accounts day .

Continue normal operation up to the day after the settlement -of-accounts day.

Note:

The system operates normally up to the day after the settlement -of-accounts day because remedial apportioning is performed for one month.

6)Start remedial apportioning.

Start remedial apportioning by clicking the [Remedial apportioning] button in the initial window. This is described with the time series example below.

Remedial interval

 

 

Backup Failure

Recovery

 

 

 

 

 

 

 

ê

 

ó

Portion for month before last (normal)

 

 

Portion for last month (remedial)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Now

˜

Note

• Perform remedial proportioning from the day after the settle-of-accounts day. However, except when it is different from the normal settlement -of-accounts term. Remedial apportioning can begin two days after the recovery day. (Only when the day after the recovery day was normally charged.)

7) Settlement -of-accounts term setting

Set the settlement-of-accounts term (start day and end day) at the remedial apportioning setting screen. The initial value is the settlement-of-accounts term of the previous month.

8) Total air-conditioning charge setting

Set the total air-conditioning charge for the settlement - of-accounts term.

Note:

• When the settlement -of-accounts term is one month and includes a standard charge,

set the total air-conditioning charge including this standard charge.

Remedial apportioning setting window

When there is one power charge, the total air-conditioning charge does not have to be set. This item appears in gray.

9)Include/Not include standard charge setting

When the settlement-of-accounts term is one month, [Include] or [Not include] standard charge can be selected. Set whether or not the standard charge is to be included.

10)Remedial interval setting

Set the remedial apportioning interval. The remedial start day is the backup day and the remedial end day is the recovery day.

68

Image 71
Contents Please keep this manual for future use Please read this manual before using the unitContents Page Do not use with other applications Safety PrecautionsOther machines ¡ *1 System Requirements Requirements system recommendationsCompatible Units Restrictions RestrictionsNumber of units M e Manufacturer Model Other DevicesHardware Connection Diagram System Configuration System Configuration Example50A test run Flow of Site AdjustmentTools for Site Adjustment PC connections and settingsD e l s IP address range Test operation from centralized controller G-50APage Steps Action Details How to InstallationG-2000A Setup Preparing for installationWhen the installation is completed, restart the computer Running TG-2000A Setup New setupMsde setup Database setupRead the license agreement Check the installation folderInstallation start confirmation TG-2000A setup completionMsde uninstall G-2000A UninstallTG-2000A uninstall Part Names and Functions Window Elements Shift from the control window to the initial window Accessing Functions and Moving between WindowsBasic Mouse Operation Shift from the initial window to the control windowPage Page User Set -up Set TG -2000A functions Page Page Startup Initial Startup and Shutdown Before StartupShutting down the OS ShutdownTG-2000A Shutdown System Setting Procedure System Setting Procedure System Setting ScreenGeneral Operation User Set-upReliability Function Connection SettingSite Name Set-up Energy Monitoring RelatedPage IP address of G-50A se t-up Step Setting Procedure and RestrictionsG-50 Connection Set-up Number of G-50A se t-up StepMonitor the optional functions being used. Procedure System Configuration Set-upUnit composition set-up Step 2 G-50A data collection StepIcon Name Address range Change the unit configuration. ProcedureSe t-up of refrigerant system Step Set-up of group Step Interlocking destination un-set unit Interlocked setting StepChange the group No. Procedure Interlocking ventilation unitSet-up of model name Step Configuration Procedure and RestrictionsMonitoring Screen Set-up Set-up of the number of floors, and floor name Step Set-up of floor name and G -50 Creation of a plane view StepGroup List Set-up of icon arrange and name StepFloor Selection Display Button Set the group icons on each floor and set their namesName Change button Block Set button Release button Set the block groups. ProcedureDeleting block settings Set-up of block StepChanging the block name Check before WHM setup. Procedure Setting Procedures and RestrictionsModel Baud rate Parity Stop bit Energy Monitoring S e t-up Set Charge System options. ProcedureProportiona l division reference data Division mode StepDivision mode for outdoor unit Division mode for indoor unitDelete Watt Hour Meter Relationships Select the OC icon, and click on the selected outdoor unitDeleting Watt Hour Meter Relationships Relation between indoor units and watt hour meters StepSet the Indoor Unit and Watt Hour Meter Relationship Charge Blocks Step Set the charge blocks. ProcedureAdd charge blocks Delete the charge blockRelease a block from charge blocks Set the electric power rate schedule. Procedure Selecting a Currency from the Display ProcedureManually Setting the Currency Exit the Currency Settings10Standard charge set Step Set the standard charge . ProcedureTime Set-up Function ContentsSet the date/time . Procedure Monitor button Monitor the timeChange the password Password S e t-upNo repair is required Overview Remarks Display the Maintenance screen. Procedure Maintenance of Charge DataPreparing for Charging Data Maintenance Maintenance Methods and RestrictionsMaintaining Apportioned Unit Data Unit Data MaintenanceCorrection method Maintenance example Maintaining watt hour Meter Data Procedure Watt Hour Meter Data MaintenanceDescription of function Watt hour Meter Monitor Function ProcedureOperation Amount Data Monitoring Monitor the data for the last day after Charge Parameter OutputMonitoring operation amount data Performing charging remedy Charging RemedyOutput file data format Preparation Preparing to perform charging remedyApportioning integrated Remark InterVal Remedial apportioning setting screenRemedial apportioning confirmation screen Calculating screen Remedy when personal computer HDD fails no backup Remedy when personal computer HDD fails backup Day before recovery day Apportioning method when computer crashes Remedy when watt hour meter fails monitoring impossible Integrate d Remedy for system information setting error Total air-conditioning charge including that Air-conditioning unit error codes Error Code ListPage Page System error codes Detail of function Setting Check ListSetting item Case Test run check sheet Test Run CheckLRC Date Tester Test item Comment Charging Test Run CheckCharging No WHM connection Test Run Check Page Capacity Total Division mode Charge settingSetting Check Within OutsideExample 1100 conditioner 1300 Outside Within 12001400 Page Page WHM1 WHM2 WHM3 WHM4 WHM5 WHM6 Memo What you need Appendix 1 Installing Windows XP ProfessionalSetup Procedure Preparing for Se tupPage Windows Appendix 2 Auto Log-in Confirmation MethodWindows XP Page WT03901X01