Wizard name
Primary settings contained in the activated window
Preparation for Energy monitoring | Verifies the order of billing settings and displays warnings . |
set |
|
Model name | Sets the unit model No. |
Number of floors, and floor name | Set floor number and names . |
Floor plane drawing | Create a floor plane to be used in the floor window of the |
| Management window. |
|
|
Relation between floor and | Sets the number of |
Group icon placing and naming | Layout icons on the floor plane, and set names . |
Operation block setting | Set groups in blocks. |
Wizard name
Primary settings contained in the activated window
Maintenance of charge data | Dat a for the last 62 days from the watt hour meter, indoor units, |
(Present value monitor) | and outdoor units can be viewed and edited. |
| (Also, current values for watt hour meters can be monitored.) |
Maintenance of charge data | Watt hour meter data from the last 62 days can be viewed and |
(Meter maintenance) | edited. |
|
|
Maintenance of charge data (Unit) | Data for the last 62 days from indoor units and outdoor units can |
| be viewed and edited. |
Wizard name
Primary settings contained in the activated window
Operation amount data monitoring
Operation data stored in
Wizard name | Primary settings contained in the activated window |
|
|
Remedial apportioning setting | Remedial apportioning can be tentatively performed when |
| charging trouble occurs. |
19