*1 : When a forwarding that extends past the
Note:
•If there are two or more assumed cases, make overall judgment. The recovery order is shown below for reference.
Maintenance of charge data > Remedial apportioning setting > Unnecessary
•When forwarding of apportionment spans the
•The charge data status is irregularly processed according to the case which occurred.
•For system information setting error, there may be cases when remedial apportioning is impossible depending on the type of error setting.
The following describes the outline repair method.
| Overview |
| Remarks |
|
|
| |
|
| ||
Maintenance of | Change the proportional division parameter data | U s e w h e n s u c h p h e n o m e n a as those | |
charge data | you want to correct in indoor units for each day. | shown below occur, and you want to | |
(See section 9 . 2) | After all changes are complete, recalculate and | correct or change the proportional division | |
*1 | calculate proportionally theapportioned electric | parameter or apportioned electric power. | |
| power and air | • | Generation of forwarded and collected |
|
|
| apportioning value |
|
| • | |
|
| • Computer crash | |
|
| etc. | |
R e m e d i a l | The | U s e u n | |
apportioning | total of | following as the object . | |
( S e e s ection 9. 5) | apportioned. Then, the | • | HDD failure |
| calculated and the normal interval | • | Watt hour meter failure (monitoring |
| charge . |
| i m p o s s i b l e ) |
|
| • Computer crash | |
|
| etc. | |
|
|
|
|
*1: For With WHM connection, this function makes it possible to monitor the current integrated value of the
54