3)When the integration has already been made, select Recalculation to settle the charge for the month concerned.

Note:

It is necessary to perform the charge data maintenance on the date appointed for G-50A repair, after the next day, when the G-50A is replaced.

Since the data cannot be fully corrected when the G-50A is replaced, it is necessary to perform a special correction during failure.

<Maintenance example>

Example of “Maintenance of charge data” during G-50A failure (proportionally divided electric power charge (With RS-485 WHM connection))

1)Correct the apportioned electric power (during failure) to “0”, by which the value is changed to blue.

*Including appointed day of repair

2)Select and correct the failure period correction method from the following plans: Plan : Use of average value for one week before failure

￿Calculate the power used during the failure period proportionally by percentage using the average value for one week before the failure as the apportioned electric power for a day, and input it as apportioned electric power for the repair date.

3)When the integration has already been made, select Recalculation to settle the charge for the month concerned.

9.2.4 Watt Hour Meter Data Maintenance

This data may be changed. Follow these steps to display watt hour meter data broken down by regular hours and off hours.

Maintaining watt hour Meter Data [Procedure]

1)Click the “” button and select a watt hour meter. When the “ ” button in the watt hour meter field in the charging data maintenance screen is clicked, all the watt hour meters are displayed. Selecting the watt hour meter you want to display and clicking the [Meter Maintenance]

 

button displays the watt hour meter maintenance screen.

Watt Hour Meter Maintenance screen

2)

Select the watt hour meter data.

[Watt Hour Meter Data Display Colors]

 

Select the cell of the data to be changed (regular hours,

 

Black: Normal

 

off hours). The cursor appears in that cell.

 

Red : Abnormal

3)

Make changes to the data.

Blue : Maintenance

 

Enter the changes to the data (for each time slot).

 

Gray : No data

4)

Repeat steps 1) to 3).

 

 

Repeat these steps to make changes to the part to be

[Time zone]

 

changed.

 

Within (day) : Regular hours

5)

Click [OK] button.

Outside (night): Off hours

 

When done with these settings, click the [OK] button.

 

* If the [Cancel] button is clicked, the settings are interrupted and the screen returns to the initial window.

Note:

Corrected watt hour meter data will appear in the air-conditioning charge after recalculation. However, only watt hour units’ watt hour meters are the object. The corrected watt hour meter data does not appear at indoor units or watt hour meters connected to indoor units.

The data for that day may not be correct if there was an abnormality on the previous day. For example, when the previous day was abnormal, it may be forwarded to the next day.

The proportional division electric power displayed in red is changed to maintenance (blue) and recalculated and appears in the air-conditioning charge results. (However, all the electric power displayed in red in the air-conditioning charge settlement-of-accounts term must be maintained.)

This function cannot be used for Without WHM connection proportionally divided electric charge.

59

Image 62
Contents Please read this manual before using the unit Please keep this manual for future useContents Page Do not use with other applications Safety PrecautionsOther machines ¡ *1 System Requirements Requirements system recommendationsCompatible Units Restrictions RestrictionsNumber of units Other Devices M e Manufacturer ModelSystem Configuration System Configuration Example Hardware Connection DiagramPC connections and settings Flow of Site AdjustmentTools for Site Adjustment 50A test runTest operation from centralized controller G-50A D e l s IP address rangePage Preparing for installation InstallationG-2000A Setup Steps Action Details How toDatabase setup Running TG-2000A Setup New setupMsde setup When the installation is completed, restart the computerTG-2000A setup completion Check the installation folderInstallation start confirmation Read the license agreementMsde uninstall G-2000A UninstallTG-2000A uninstall Part Names and Functions Window Elements Shift from the initial window to the control window Accessing Functions and Moving between WindowsBasic Mouse Operation Shift from the control window to the initial windowPage Page User Set -up Set TG -2000A functions Page Page Initial Startup and Shutdown Before Startup StartupShutting down the OS ShutdownTG-2000A Shutdown System Setting Procedure System Setting Screen System Setting ProcedureUser Set-up General OperationConnection Setting Reliability FunctionEnergy Monitoring Related Site Name Set-upPage Number of G-50A se t-up Step Setting Procedure and RestrictionsG-50 Connection Set-up IP address of G-50A se t-up StepSystem Configuration Set-up Monitor the optional functions being used. Procedure2 G-50A data collection Step Unit composition set-up StepChange the unit configuration. Procedure Icon Name Address rangeSe t-up of refrigerant system Step Set-up of group Step Interlocking ventilation unit Interlocked setting StepChange the group No. Procedure Interlocking destination un-set unitSet-up of model name Step Configuration Procedure and RestrictionsMonitoring Screen Set-up Set-up of the number of floors, and floor name Step Creation of a plane view Step Set-up of floor name and G -50Set the group icons on each floor and set their names Set-up of icon arrange and name StepFloor Selection Display Button Group ListSet-up of block Step Set the block groups. ProcedureDeleting block settings Name Change button Block Set button Release buttonChanging the block name Setting Procedures and Restrictions Check before WHM setup. ProcedureModel Baud rate Parity Stop bit Set Charge System options. Procedure Energy Monitoring S e t-upDivision mode for indoor unit Division mode StepDivision mode for outdoor unit Proportiona l division reference dataSelect the OC icon, and click on the selected outdoor unit Delete Watt Hour Meter RelationshipsDeleting Watt Hour Meter Relationships Relation between indoor units and watt hour meters StepSet the Indoor Unit and Watt Hour Meter Relationship Set the charge blocks. Procedure Charge Blocks StepAdd charge blocks Delete the charge blockRelease a block from charge blocks Exit the Currency Settings Selecting a Currency from the Display ProcedureManually Setting the Currency Set the electric power rate schedule. ProcedureSet the standard charge . Procedure 10Standard charge set StepTime Set-up Function ContentsSet the date/time . Procedure Monitor the time Monitor buttonPassword S e t-up Change the passwordNo repair is required Overview Remarks Maintenance Methods and Restrictions Maintenance of Charge DataPreparing for Charging Data Maintenance Display the Maintenance screen. ProcedureUnit Data Maintenance Maintaining Apportioned Unit DataCorrection method Maintenance example Watt Hour Meter Data Maintenance Maintaining watt hour Meter Data ProcedureDescription of function Watt hour Meter Monitor Function ProcedureOperation Amount Data Monitoring Monitor the data for the last day after Charge Parameter OutputMonitoring operation amount data Performing charging remedy Charging RemedyOutput file data format Preparing to perform charging remedy PreparationRemedial apportioning setting screen Apportioning integrated Remark InterValRemedial apportioning confirmation screen Calculating screen Remedy when personal computer HDD fails no backup Remedy when personal computer HDD fails backup Day before recovery day Apportioning method when computer crashes Remedy when watt hour meter fails monitoring impossible Integrate d Remedy for system information setting error Total air-conditioning charge including that Error Code List Air-conditioning unit error codesPage Page System error codes Detail of function Setting Check ListSetting item Case Test Run Check Test run check sheetLRC Date Tester Test item Comment Charging Test Run CheckCharging No WHM connection Test Run Check Page Capacity Check Within Outside Division mode Charge settingSetting TotalExample 1100 conditioner 1300 Outside Within 12001400 Page Page WHM1 WHM2 WHM3 WHM4 WHM5 WHM6 Memo Preparing for Se tup Appendix 1 Installing Windows XP ProfessionalSetup Procedure What you needPage Windows Appendix 2 Auto Log-in Confirmation MethodWindows XP Page WT03901X01