Mitsubishi Electronics TG-2000A operation manual Capacity

Page 87

Charging test run check sheet [Checking order ]

 

I t e m

Division mode

Charge setting

Settlement

Indoor unit setting

-

 

 

 

 

selection

 

date setting

contents

 

 

 

 

Check

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Name of managed equipment

 

 

 

Floor G-50A IP Unit Group address address address

Charge block

name

Indoor unit

F a n

performance

capacity

 

 

Aux. heater capacity *1

Comment

*1: This item is not used.

84

Image 87
Contents Please keep this manual for future use Please read this manual before using the unitContents Page Safety Precautions Other machinesDo not use with other applications System Requirements Requirements system recommendations Compatible Units¡ *1 Restrictions Number of unitsRestrictions M e Manufacturer Model Other DevicesHardware Connection Diagram System Configuration System Configuration Example50A test run Flow of Site AdjustmentTools for Site Adjustment PC connections and settingsD e l s IP address range Test operation from centralized controller G-50APage Steps Action Details How to InstallationG-2000A Setup Preparing for installationWhen the installation is completed, restart the computer Running TG-2000A Setup New setupMsde setup Database setupRead the license agreement Check the installation folderInstallation start confirmation TG-2000A setup completionG-2000A Uninstall TG-2000A uninstallMsde uninstall Part Names and Functions Window Elements Shift from the control window to the initial window Accessing Functions and Moving between WindowsBasic Mouse Operation Shift from the initial window to the control windowPage Page User Set -up Set TG -2000A functions Page Page Startup Initial Startup and Shutdown Before StartupShutdown TG-2000A ShutdownShutting down the OS System Setting Procedure System Setting Procedure System Setting ScreenGeneral Operation User Set-upReliability Function Connection SettingSite Name Set-up Energy Monitoring RelatedPage IP address of G-50A se t-up Step Setting Procedure and RestrictionsG-50 Connection Set-up Number of G-50A se t-up StepMonitor the optional functions being used. Procedure System Configuration Set-upUnit composition set-up Step 2 G-50A data collection StepIcon Name Address range Change the unit configuration. ProcedureSe t-up of refrigerant system Step Set-up of group Step Interlocking destination un-set unit Interlocked setting StepChange the group No. Procedure Interlocking ventilation unitConfiguration Procedure and Restrictions Monitoring Screen Set-upSet-up of model name Step Set-up of the number of floors, and floor name Step Set-up of floor name and G -50 Creation of a plane view StepGroup List Set-up of icon arrange and name StepFloor Selection Display Button Set the group icons on each floor and set their namesName Change button Block Set button Release button Set the block groups. ProcedureDeleting block settings Set-up of block StepChanging the block name Check before WHM setup. Procedure Setting Procedures and RestrictionsModel Baud rate Parity Stop bit Energy Monitoring S e t-up Set Charge System options. ProcedureProportiona l division reference data Division mode StepDivision mode for outdoor unit Division mode for indoor unitDelete Watt Hour Meter Relationships Select the OC icon, and click on the selected outdoor unitRelation between indoor units and watt hour meters Step Set the Indoor Unit and Watt Hour Meter RelationshipDeleting Watt Hour Meter Relationships Charge Blocks Step Set the charge blocks. ProcedureDelete the charge block Release a block from charge blocksAdd charge blocks Set the electric power rate schedule. Procedure Selecting a Currency from the Display ProcedureManually Setting the Currency Exit the Currency Settings10Standard charge set Step Set the standard charge . ProcedureFunction Contents Set the date/time . ProcedureTime Set-up Monitor button Monitor the timeChange the password Password S e t-upNo repair is required Overview Remarks Display the Maintenance screen. Procedure Maintenance of Charge DataPreparing for Charging Data Maintenance Maintenance Methods and RestrictionsMaintaining Apportioned Unit Data Unit Data MaintenanceCorrection method Maintenance example Maintaining watt hour Meter Data Procedure Watt Hour Meter Data MaintenanceWatt hour Meter Monitor Function Procedure Operation Amount Data MonitoringDescription of function Charge Parameter Output Monitoring operation amount dataMonitor the data for the last day after Charging Remedy Output file data formatPerforming charging remedy Preparation Preparing to perform charging remedyApportioning integrated Remark InterVal Remedial apportioning setting screenRemedial apportioning confirmation screen Calculating screen Remedy when personal computer HDD fails no backup Remedy when personal computer HDD fails backup Day before recovery day Apportioning method when computer crashes Remedy when watt hour meter fails monitoring impossible Integrate d Remedy for system information setting error Total air-conditioning charge including that Air-conditioning unit error codes Error Code ListPage Page System error codes Setting Check List Setting item CaseDetail of function Test run check sheet Test Run CheckLRC Date Tester Charging Test Run Check Charging No WHM connection Test Run CheckTest item Comment Page Capacity Total Division mode Charge settingSetting Check Within OutsideExample 1100 conditioner 1300 Outside Within 12001400 Page Page WHM1 WHM2 WHM3 WHM4 WHM5 WHM6 Memo What you need Appendix 1 Installing Windows XP ProfessionalSetup Procedure Preparing for Se tupPage Appendix 2 Auto Log-in Confirmation Method Windows XPWindows Page WT03901X01