Mitsubishi Electronics TG-2000A operation manual System Setting Procedure System Setting Screen

Page 25

8. System Setting Procedure

8.1System Setting Screen

The following is an explanation of the items found in the System Settings window.

Maintenance group

User Set-up

group

System Set-up

group

Initial window

Function group

Function

Operation details

 

 

 

 

 

 

 

User set- up

Allow or disallow certain functions

[User Set- up group]

Site name set- up

Set the building name

 

 

 

 

Password set - up

The password can be changed

 

 

 

 

G- 50A connection set-up

Sets the number of G-50A units connected and the IP address.

 

 

 

 

System configuration set-up

Sets the system configuration, group, interlocking unit, etc.

 

Monitoring screen set-up

Executes the model name setting, plane drawing creation, group icon

[System Set-up group]

 

arrangement, etc.

 

 

 

Watt hour meter set- up

Set the watt hour meter serial port and watt hour meter address

 

 

 

 

Energy monitoring set-up

Set the system billing function

 

 

 

 

Time set- up

Set the current time

 

Maintenance of charge data

Proportional billing information can be revised .

 

 

 

[Maintenance group]

Operation amount data

Operation amount data stored in G-50A can be monitored and saved.

monitor

 

 

Remedial apportioning

Remedial apportioning can be tentatively performed when charging

 

setting

trouble o c c u r s .

 

 

 

Note:

See Chapter 9 for the maintenance group items.

The set items that are displayed depend on the functions of the TG -2000A purchased.

Displays the operation contents of the select buttons on each setting screen.

Buttons

Operation contents

[OK]

Validates the contents set on this display screen to advance to the next setting screen.

(Advances to the next setting screen if it is the preparation screen . )

 

[Next]

Advances to the next setting screen .

 

 

[Back]

Invalidates the contents set on this display screen to return to the last screen.

[Cancel]

Invalidates the contents set on this display screen to shift to the initial screen.

 

 

8.2System Setting Procedure

The following is an explanation of the System Settings performed at the Initial window.

When no System Settings exist

User set-up ￿ Site name set -up￿ G-50A connection set-up ￿ System configuration set-up￿Monitoring screen set-up ￿ Watt hour meter set-up ￿ Energy monitoring set-up (Password set-up ￿ Time set-up)

22

Image 25
Contents Please keep this manual for future use Please read this manual before using the unitContents Page Other machines Safety PrecautionsDo not use with other applications Compatible Units System Requirements Requirements system recommendations¡ *1 Number of units RestrictionsRestrictions M e Manufacturer Model Other DevicesHardware Connection Diagram System Configuration System Configuration ExampleTools for Site Adjustment Flow of Site AdjustmentPC connections and settings 50A test runD e l s IP address range Test operation from centralized controller G-50APage G-2000A Setup InstallationPreparing for installation Steps Action Details How toMsde setup Running TG-2000A Setup New setupDatabase setup When the installation is completed, restart the computerInstallation start confirmation Check the installation folderTG-2000A setup completion Read the license agreementTG-2000A uninstall G-2000A UninstallMsde uninstall Part Names and Functions Window Elements Basic Mouse Operation Accessing Functions and Moving between WindowsShift from the initial window to the control window Shift from the control window to the initial windowPage Page User Set -up Set TG -2000A functions Page Page Startup Initial Startup and Shutdown Before StartupTG-2000A Shutdown ShutdownShutting down the OS System Setting Procedure System Setting Procedure System Setting ScreenGeneral Operation User Set-upReliability Function Connection SettingSite Name Set-up Energy Monitoring RelatedPage G-50 Connection Set-up Setting Procedure and RestrictionsNumber of G-50A se t-up Step IP address of G-50A se t-up StepMonitor the optional functions being used. Procedure System Configuration Set-upUnit composition set-up Step 2 G-50A data collection StepIcon Name Address range Change the unit configuration. ProcedureSe t-up of refrigerant system Step Set-up of group Step Change the group No. Procedure Interlocked setting StepInterlocking ventilation unit Interlocking destination un-set unitMonitoring Screen Set-up Configuration Procedure and RestrictionsSet-up of model name Step Set-up of the number of floors, and floor name Step Set-up of floor name and G -50 Creation of a plane view StepFloor Selection Display Button Set-up of icon arrange and name StepSet the group icons on each floor and set their names Group ListDeleting block settings Set the block groups. ProcedureSet-up of block Step Name Change button Block Set button Release buttonChanging the block name Check before WHM setup. Procedure Setting Procedures and RestrictionsModel Baud rate Parity Stop bit Energy Monitoring S e t-up Set Charge System options. ProcedureDivision mode for outdoor unit Division mode StepDivision mode for indoor unit Proportiona l division reference dataDelete Watt Hour Meter Relationships Select the OC icon, and click on the selected outdoor unitSet the Indoor Unit and Watt Hour Meter Relationship Relation between indoor units and watt hour meters StepDeleting Watt Hour Meter Relationships Charge Blocks Step Set the charge blocks. ProcedureRelease a block from charge blocks Delete the charge blockAdd charge blocks Manually Setting the Currency Selecting a Currency from the Display ProcedureExit the Currency Settings Set the electric power rate schedule. Procedure10Standard charge set Step Set the standard charge . ProcedureSet the date/time . Procedure Function ContentsTime Set-up Monitor button Monitor the timeChange the password Password S e t-upNo repair is required Overview Remarks Preparing for Charging Data Maintenance Maintenance of Charge DataMaintenance Methods and Restrictions Display the Maintenance screen. ProcedureMaintaining Apportioned Unit Data Unit Data MaintenanceCorrection method Maintenance example Maintaining watt hour Meter Data Procedure Watt Hour Meter Data MaintenanceOperation Amount Data Monitoring Watt hour Meter Monitor Function ProcedureDescription of function Monitoring operation amount data Charge Parameter OutputMonitor the data for the last day after Output file data format Charging RemedyPerforming charging remedy Preparation Preparing to perform charging remedyApportioning integrated Remark InterVal Remedial apportioning setting screenRemedial apportioning confirmation screen Calculating screen Remedy when personal computer HDD fails no backup Remedy when personal computer HDD fails backup Day before recovery day Apportioning method when computer crashes Remedy when watt hour meter fails monitoring impossible Integrate d Remedy for system information setting error Total air-conditioning charge including that Air-conditioning unit error codes Error Code ListPage Page System error codes Setting item Case Setting Check ListDetail of function Test run check sheet Test Run CheckLRC Date Tester Charging No WHM connection Test Run Check Charging Test Run CheckTest item Comment Page Capacity Setting Division mode Charge settingCheck Within Outside TotalExample 1100 conditioner 1300 Outside Within 12001400 Page Page WHM1 WHM2 WHM3 WHM4 WHM5 WHM6 Memo Setup Procedure Appendix 1 Installing Windows XP ProfessionalPreparing for Se tup What you needPage Windows XP Appendix 2 Auto Log-in Confirmation MethodWindows Page WT03901X01