Mitsubishi Electronics TG-2000A Division mode Step, Proportiona l division reference data

Page 46
Select G-50A Select WHM
Outdoor Unit and Watt Hour Meter Relationship Settings window

8 . 9 . 2 Division mode (Step 1)

Follow these steps to set the reference data and Division

Mode for outdoor and indoor units in the charge system.

Select the Division Mode or proportional division refer- ence data .

[Procedure]

1)Select the Division Mode.

Click the option button of the desired Division Mode.

2)Select [OK] button.

When done making selections, click the [OK] button.

*If the [Cancel] button is clicked, the settings are interrupted and the screen returns to the initial window.

Division Mode Set-up window

Proportiona l division reference data

The proportional division data for the outdoor unit is divided into two: Operating Power and Standby Power (for the crankcase heater). The Operating Power for the outdoor unit is divided proportionally in accordance with the reference operation data of the indoor unit.

Reference data 1: Capacity save(electric amount used) ... (Default setting)

Reference data 2: Thermo-ON time (usage time)

Division mode for outdoor unit

Select the Standby Power mode from the following list.

Mode 1: Do not include the crank case heater value in the apportioned data.

Mode 2: Division the crank case heater value as a separate item. (Default)

Mode 3: Calculate the crank case heater value as a shared expense, do not division.

Division mode for indoor unit

Select the division mode for indoor unit electric amount used (primarily FAN).

Do

not : Do not division the power consumption of indoor units.

Do

: Use the formula (cumulative indoor unit usage × FAN capacity) when dividing. (default)

Note:

The proportionally divided power charge function (Without WHM connection) can only be selected as the “Proportional division reference data”.

The capacity save is given by integrating the operation volume with the working capacity divided into 3.

Please select the Division Mode appropriate for the system.

For the proportionally divided power charge (manual input of the electric amount), the calculation is made in accordance with the operation volume (reference data) of the indoor unit.

8.9. 3 Relation between outdoor units and watt hour meters (Step 2)

Follow these steps to set the connection between the outdoor unit and the watt hour meter. Perform these steps for all outdoor units connected to a watt hour meter.

Set the Outdoor Unit and watt hour Meter Relationship. [Procedure]

1)Click on the “/” button to select the watt hour meter Clicking the “/ ” button, select the target meter. Select only meters that are connected to the outdoor unit.

2)Select the G-50 number using the “/ ” button Select the G-50A number for the outdoor unit connected to the watt hour meter.

43

Image 46
Contents Please read this manual before using the unit Please keep this manual for future useContents Page Other machines Safety PrecautionsDo not use with other applications Compatible Units System Requirements Requirements system recommendations¡ *1 Number of units RestrictionsRestrictions Other Devices M e Manufacturer ModelSystem Configuration System Configuration Example Hardware Connection DiagramPC connections and settings Flow of Site AdjustmentTools for Site Adjustment 50A test runTest operation from centralized controller G-50A D e l s IP address rangePage Preparing for installation InstallationG-2000A Setup Steps Action Details How toDatabase setup Running TG-2000A Setup New setupMsde setup When the installation is completed, restart the computerTG-2000A setup completion Check the installation folderInstallation start confirmation Read the license agreementTG-2000A uninstall G-2000A UninstallMsde uninstall Part Names and Functions Window Elements Shift from the initial window to the control window Accessing Functions and Moving between WindowsBasic Mouse Operation Shift from the control window to the initial windowPage Page User Set -up Set TG -2000A functions Page Page Initial Startup and Shutdown Before Startup StartupTG-2000A Shutdown ShutdownShutting down the OS System Setting Procedure System Setting Screen System Setting ProcedureUser Set-up General OperationConnection Setting Reliability FunctionEnergy Monitoring Related Site Name Set-upPage Number of G-50A se t-up Step Setting Procedure and RestrictionsG-50 Connection Set-up IP address of G-50A se t-up StepSystem Configuration Set-up Monitor the optional functions being used. Procedure2 G-50A data collection Step Unit composition set-up StepChange the unit configuration. Procedure Icon Name Address rangeSe t-up of refrigerant system Step Set-up of group Step Interlocking ventilation unit Interlocked setting StepChange the group No. Procedure Interlocking destination un-set unitMonitoring Screen Set-up Configuration Procedure and RestrictionsSet-up of model name Step Set-up of the number of floors, and floor name Step Creation of a plane view Step Set-up of floor name and G -50Set the group icons on each floor and set their names Set-up of icon arrange and name StepFloor Selection Display Button Group ListSet-up of block Step Set the block groups. ProcedureDeleting block settings Name Change button Block Set button Release buttonChanging the block name Setting Procedures and Restrictions Check before WHM setup. ProcedureModel Baud rate Parity Stop bit Set Charge System options. Procedure Energy Monitoring S e t-upDivision mode for indoor unit Division mode StepDivision mode for outdoor unit Proportiona l division reference dataSelect the OC icon, and click on the selected outdoor unit Delete Watt Hour Meter RelationshipsSet the Indoor Unit and Watt Hour Meter Relationship Relation between indoor units and watt hour meters StepDeleting Watt Hour Meter Relationships Set the charge blocks. Procedure Charge Blocks StepRelease a block from charge blocks Delete the charge blockAdd charge blocks Exit the Currency Settings Selecting a Currency from the Display ProcedureManually Setting the Currency Set the electric power rate schedule. ProcedureSet the standard charge . Procedure 10Standard charge set StepSet the date/time . Procedure Function ContentsTime Set-up Monitor the time Monitor buttonPassword S e t-up Change the passwordNo repair is required Overview Remarks Maintenance Methods and Restrictions Maintenance of Charge DataPreparing for Charging Data Maintenance Display the Maintenance screen. ProcedureUnit Data Maintenance Maintaining Apportioned Unit DataCorrection method Maintenance example Watt Hour Meter Data Maintenance Maintaining watt hour Meter Data ProcedureOperation Amount Data Monitoring Watt hour Meter Monitor Function ProcedureDescription of function Monitoring operation amount data Charge Parameter OutputMonitor the data for the last day after Output file data format Charging RemedyPerforming charging remedy Preparing to perform charging remedy PreparationRemedial apportioning setting screen Apportioning integrated Remark InterValRemedial apportioning confirmation screen Calculating screen Remedy when personal computer HDD fails no backup Remedy when personal computer HDD fails backup Day before recovery day Apportioning method when computer crashes Remedy when watt hour meter fails monitoring impossible Integrate d Remedy for system information setting error Total air-conditioning charge including that Error Code List Air-conditioning unit error codesPage Page System error codes Setting item Case Setting Check ListDetail of function Test Run Check Test run check sheetLRC Date Tester Charging No WHM connection Test Run Check Charging Test Run CheckTest item Comment Page Capacity Check Within Outside Division mode Charge settingSetting TotalExample 1100 conditioner 1300 Outside Within 12001400 Page Page WHM1 WHM2 WHM3 WHM4 WHM5 WHM6 Memo Preparing for Se tup Appendix 1 Installing Windows XP ProfessionalSetup Procedure What you needPage Windows XP Appendix 2 Auto Log-in Confirmation MethodWindows Page WT03901X01