Mitsubishi Electronics TG-2000A Delete the charge block, Release a block from charge blocks

Page 50
Delete Block button Add Block button
Add & Delete setting window

Setting method of “Create separately”

When the "Create separately" is selected, the same contents as those of the operation block are displayed as charging block contents.

2)Select the charging block.

Select the charging block to be selected from the charging block column. The cell of the charging block selected changes to blue.

3)Input the charge block name.

Input the charging block name in each column of the charge block.

4)Select the operation block.

Click the operation block to be set for the charging block from the column of the operation block (operation block No., name) to set it to selected status.

*Note that it is not displayed unless there is a operation block that is not set. Set the operation block to be selected to not -set status by executing the "Delete charging block".

5)Move it to the object block column.

Click the selected block at the block column (intended for charge), by which the operation block is registered in the charging block.

6)Click [OK] button after completing all the settings.

After completing the settings of all charging blocks, click the [OK] button.

*If the [Cancel] button is clicked, the settings are interrupted and the screen returns to the initial window.

Note:

Block names may be a maximum of 20 characters

It is possible to set up to 2,000 charge blocks. The charge block consists of the operation block.

The settlement of the air-conditioning charge is made for each charging block. It applies only to the air conditioner to which the proportional division is executable.

If there is a operation block with incomplete settings in the charge block, a warning will appear. Perform settings on all blocks to proceed.

For without WHM connection, it recommends making the number of charge blocks less than into 100.

Delete the charge block.

Delete the charging block, and reset the set operation block to not -set .

[Procedure]

1)Click the charging block.

Click the block whose setting you want to delete. The block is selected. (Blue display)

2)Click [Delete Block] button.

When the [Delete Block] button is clicked, the block settings are deleted and the block returns to the “Block No.: Name” column.

Release a block from charge blocks.

Reset the setting of a specified operation block from the charge block.

[Procedure]

1) Select the target charge block.

Click the charge blocks to which the target block you want to select and release belongs. The selected charge block is displayed in blue.

2)Select the target block.

Click the block you want to release in the “Block Target” column from which the target block is selected. That block is moved to the “Block No. : Name” column.

Add charge blocks.

Follow these steps to add a charge block. [Procedure]

1)Select [Add Block] button.

To add a charging block, click the [Add Block] button. A charge block is added as the lowest nonexistent block No.

*For setting the charge block name, etc., refer to "Set the charge blocks".

47

Image 50
Contents Please read this manual before using the unit Please keep this manual for future useContents Page Do not use with other applications Safety PrecautionsOther machines ¡ *1 System Requirements Requirements system recommendationsCompatible Units Restrictions RestrictionsNumber of units Other Devices M e Manufacturer ModelSystem Configuration System Configuration Example Hardware Connection DiagramPC connections and settings Flow of Site AdjustmentTools for Site Adjustment 50A test runTest operation from centralized controller G-50A D e l s IP address rangePage Preparing for installation InstallationG-2000A Setup Steps Action Details How toDatabase setup Running TG-2000A Setup New setupMsde setup When the installation is completed, restart the computerTG-2000A setup completion Check the installation folderInstallation start confirmation Read the license agreementMsde uninstall G-2000A UninstallTG-2000A uninstall Part Names and Functions Window Elements Shift from the initial window to the control window Accessing Functions and Moving between WindowsBasic Mouse Operation Shift from the control window to the initial windowPage Page User Set -up Set TG -2000A functions Page Page Initial Startup and Shutdown Before Startup StartupShutting down the OS ShutdownTG-2000A Shutdown System Setting Procedure System Setting Screen System Setting ProcedureUser Set-up General OperationConnection Setting Reliability FunctionEnergy Monitoring Related Site Name Set-upPage Number of G-50A se t-up Step Setting Procedure and RestrictionsG-50 Connection Set-up IP address of G-50A se t-up StepSystem Configuration Set-up Monitor the optional functions being used. Procedure2 G-50A data collection Step Unit composition set-up StepChange the unit configuration. Procedure Icon Name Address rangeSe t-up of refrigerant system Step Set-up of group Step Interlocking ventilation unit Interlocked setting StepChange the group No. Procedure Interlocking destination un-set unitSet-up of model name Step Configuration Procedure and RestrictionsMonitoring Screen Set-up Set-up of the number of floors, and floor name Step Creation of a plane view Step Set-up of floor name and G -50Set the group icons on each floor and set their names Set-up of icon arrange and name StepFloor Selection Display Button Group ListSet-up of block Step Set the block groups. ProcedureDeleting block settings Name Change button Block Set button Release buttonChanging the block name Setting Procedures and Restrictions Check before WHM setup. ProcedureModel Baud rate Parity Stop bit Set Charge System options. Procedure Energy Monitoring S e t-upDivision mode for indoor unit Division mode StepDivision mode for outdoor unit Proportiona l division reference dataSelect the OC icon, and click on the selected outdoor unit Delete Watt Hour Meter RelationshipsDeleting Watt Hour Meter Relationships Relation between indoor units and watt hour meters StepSet the Indoor Unit and Watt Hour Meter Relationship Set the charge blocks. Procedure Charge Blocks StepAdd charge blocks Delete the charge blockRelease a block from charge blocks Exit the Currency Settings Selecting a Currency from the Display ProcedureManually Setting the Currency Set the electric power rate schedule. ProcedureSet the standard charge . Procedure 10Standard charge set StepTime Set-up Function ContentsSet the date/time . Procedure Monitor the time Monitor buttonPassword S e t-up Change the passwordNo repair is required Overview Remarks Maintenance Methods and Restrictions Maintenance of Charge DataPreparing for Charging Data Maintenance Display the Maintenance screen. ProcedureUnit Data Maintenance Maintaining Apportioned Unit DataCorrection method Maintenance example Watt Hour Meter Data Maintenance Maintaining watt hour Meter Data ProcedureDescription of function Watt hour Meter Monitor Function ProcedureOperation Amount Data Monitoring Monitor the data for the last day after Charge Parameter OutputMonitoring operation amount data Performing charging remedy Charging RemedyOutput file data format Preparing to perform charging remedy PreparationRemedial apportioning setting screen Apportioning integrated Remark InterValRemedial apportioning confirmation screen Calculating screen Remedy when personal computer HDD fails no backup Remedy when personal computer HDD fails backup Day before recovery day Apportioning method when computer crashes Remedy when watt hour meter fails monitoring impossible Integrate d Remedy for system information setting error Total air-conditioning charge including that Error Code List Air-conditioning unit error codesPage Page System error codes Detail of function Setting Check ListSetting item Case Test Run Check Test run check sheetLRC Date Tester Test item Comment Charging Test Run CheckCharging No WHM connection Test Run Check Page Capacity Check Within Outside Division mode Charge settingSetting TotalExample 1100 conditioner 1300 Outside Within 12001400 Page Page WHM1 WHM2 WHM3 WHM4 WHM5 WHM6 Memo Preparing for Se tup Appendix 1 Installing Windows XP ProfessionalSetup Procedure What you needPage Windows Appendix 2 Auto Log-in Confirmation MethodWindows XP Page WT03901X01