Mitsubishi Electronics TG-2000A operation manual Remedy when personal computer HDD fails backup

Page 70
Watt hour meter air-conditioning charge result

Note:

Perform remedial proportioning from the day after the settle-of-accounts day. However, except when it is different from the normal settlement -of-accounts term. Remedial apportioning can begin two days after the recovery day. (Only when the day after the recovery day was normally charged.)

7)Settlement -of-accounts term setting

Set the settlement-of-accounts term (start day and end day) at the remedial apportioning setting screen. The initial value is the settlement-of-accounts term of the previous month.

8)Total air-conditioning charge setting

Set the total air-conditioning charge for the settlement - of-accounts term.

Note:

When the settlement-of-accounts term is one

month and includes a standard charge, set the

Remedial apportioning setting window

total air-conditioning charge including this

 

standard charge.

 

When there is one power charge (no time setting), the total air-conditioning charge does not have to be set. This item appears in gray.

9)Include/Not include standard charge setting

When the settlement-of-accounts term is one month, [Include] or [Not include] standard charge can be selected. Set whether or not the standard charge is to be included.

10)Remedial interval setting

Set the remedial apportioning interval. The remedial start day is the settlement-of-accounts start day and the remedial end day is the settlement -of-accounts end day.

Note:

“Recovery day” is the day the system was recovered from an HDD failure and normal operation was restarted.

11)Watt hour meter integrated value setting

Set the watt hour meter integrated value of each watt hour meter from the air-conditioning charge result (watt hour meter) for the month before last. The watt hour meter calculated result for the month before last is the watt hour meter integrated value for the last day. Use that value.

The watt hour meter integrated value for all the watt hour meters must be corrected and input. When the integrated value data changes, the display turns blue. The initial value before correction and input is a blank display.

When setting of the remedial apportioning screen is complete, perform section 9.5.2 “(3) Calculate remedial apportioning” .

9.5.4 Remedy when personal computer HDD fails (backup)

The following describes the remedy when the computer HDD fails and the charge data is backed up.

1)HDD recovery

Recover from personal computer HDD failure by replacing the HDD, etc. and install the necessary OS.

2)TG-2000A installation

Install TG-2000A MSDE, database, and this program. Refer to the setup method and install.

3)System configuration and charging system restoration

Install the database backing up the air conditioning system configuration, charging system, charging data, etc.

Note:

For the specific procedure, consult your distributor or sales company.

67

Image 70
Contents Please read this manual before using the unit Please keep this manual for future useContents Page Other machines Safety PrecautionsDo not use with other applications Compatible Units System Requirements Requirements system recommendations¡ *1 Number of units RestrictionsRestrictions Other Devices M e Manufacturer ModelSystem Configuration System Configuration Example Hardware Connection DiagramPC connections and settings Flow of Site AdjustmentTools for Site Adjustment 50A test runTest operation from centralized controller G-50A D e l s IP address rangePage Preparing for installation InstallationG-2000A Setup Steps Action Details How toDatabase setup Running TG-2000A Setup New setupMsde setup When the installation is completed, restart the computerTG-2000A setup completion Check the installation folderInstallation start confirmation Read the license agreementTG-2000A uninstall G-2000A UninstallMsde uninstall Part Names and Functions Window Elements Shift from the initial window to the control window Accessing Functions and Moving between WindowsBasic Mouse Operation Shift from the control window to the initial windowPage Page User Set -up Set TG -2000A functions Page Page Initial Startup and Shutdown Before Startup StartupTG-2000A Shutdown ShutdownShutting down the OS System Setting Procedure System Setting Screen System Setting ProcedureUser Set-up General OperationConnection Setting Reliability FunctionEnergy Monitoring Related Site Name Set-upPage Number of G-50A se t-up Step Setting Procedure and RestrictionsG-50 Connection Set-up IP address of G-50A se t-up StepSystem Configuration Set-up Monitor the optional functions being used. Procedure2 G-50A data collection Step Unit composition set-up StepChange the unit configuration. Procedure Icon Name Address rangeSe t-up of refrigerant system Step Set-up of group Step Interlocking ventilation unit Interlocked setting StepChange the group No. Procedure Interlocking destination un-set unitMonitoring Screen Set-up Configuration Procedure and RestrictionsSet-up of model name Step Set-up of the number of floors, and floor name Step Creation of a plane view Step Set-up of floor name and G -50Set the group icons on each floor and set their names Set-up of icon arrange and name StepFloor Selection Display Button Group ListSet-up of block Step Set the block groups. ProcedureDeleting block settings Name Change button Block Set button Release buttonChanging the block name Setting Procedures and Restrictions Check before WHM setup. ProcedureModel Baud rate Parity Stop bit Set Charge System options. Procedure Energy Monitoring S e t-upDivision mode for indoor unit Division mode StepDivision mode for outdoor unit Proportiona l division reference dataSelect the OC icon, and click on the selected outdoor unit Delete Watt Hour Meter RelationshipsSet the Indoor Unit and Watt Hour Meter Relationship Relation between indoor units and watt hour meters StepDeleting Watt Hour Meter Relationships Set the charge blocks. Procedure Charge Blocks StepRelease a block from charge blocks Delete the charge blockAdd charge blocks Exit the Currency Settings Selecting a Currency from the Display ProcedureManually Setting the Currency Set the electric power rate schedule. ProcedureSet the standard charge . Procedure 10Standard charge set StepSet the date/time . Procedure Function ContentsTime Set-up Monitor the time Monitor buttonPassword S e t-up Change the passwordNo repair is required Overview Remarks Maintenance Methods and Restrictions Maintenance of Charge DataPreparing for Charging Data Maintenance Display the Maintenance screen. ProcedureUnit Data Maintenance Maintaining Apportioned Unit DataCorrection method Maintenance example Watt Hour Meter Data Maintenance Maintaining watt hour Meter Data ProcedureOperation Amount Data Monitoring Watt hour Meter Monitor Function ProcedureDescription of function Monitoring operation amount data Charge Parameter OutputMonitor the data for the last day after Output file data format Charging RemedyPerforming charging remedy Preparing to perform charging remedy PreparationRemedial apportioning setting screen Apportioning integrated Remark InterValRemedial apportioning confirmation screen Calculating screen Remedy when personal computer HDD fails no backup Remedy when personal computer HDD fails backup Day before recovery day Apportioning method when computer crashes Remedy when watt hour meter fails monitoring impossible Integrate d Remedy for system information setting error Total air-conditioning charge including that Error Code List Air-conditioning unit error codesPage Page System error codes Setting item Case Setting Check ListDetail of function Test Run Check Test run check sheetLRC Date Tester Charging No WHM connection Test Run Check Charging Test Run CheckTest item Comment Page Capacity Check Within Outside Division mode Charge settingSetting TotalExample 1100 conditioner 1300 Outside Within 12001400 Page Page WHM1 WHM2 WHM3 WHM4 WHM5 WHM6 Memo Preparing for Se tup Appendix 1 Installing Windows XP ProfessionalSetup Procedure What you needPage Windows XP Appendix 2 Auto Log-in Confirmation MethodWindows Page WT03901X01