Mitsubishi Electronics TG-2000A operation manual User Set-up, General Operation

Page 26

*Even if the G-50A is not actually connected, it is possible to set it in advance as long as information such as system configuration, etc. is available.

Note:

If the settings are done out of order, some items will not be available and others will have to be set again.

Time set-up and Site name set-up are only performed when necessary. Check the time for each G-50A with “Time set -up”, and set the time when necessary.

When System Settings exist

Make any changes to the settings.

Note:

Changing certain settings affects the status of other settings.

User set -up in particular affect other settings and functions.

Changing the settings on the left affects the settings on the right.

System configuration set -up > Monitoring screen set -up, Energy monitoring set-up Monitoring screen set -up > Energy monitoring set -up

Watt hour meter set -up > Energy monitoring set-up

8.3User Set-up

Use these settings to allow or disallow TG-2000A general operations, printer, charge (billing), and external I/O functions.

Activating TG-2000A Functions

[Procedure]

1) Click the User set -up button

From the Initial window, click the User set-up button in the User set -up group. The User set -up window appears.

8.3.1 General Operation

Set the schedule and summer time and turn on and off the filter sign automatic display function.

Setting general operation options [Procedure]

1)Click the option button.

Set the Schedule Set -up, Summer Time Set -up and Filter sign automatic display setting. To do this, click the option button of the setting.

Schedule Set-up

 

Off (Deactivate)

: Turns the scheduling function off.

On (Activate)

: Turns the scheduling function on.

 

(Default)

Summer Time S e t-up

Off (Deactivate)

: Do not automatically adjust the

 

G-50A for summer time.

On (Activate)

: Automatically adjust the G-50A for

 

summer time. (Automatic updates

 

take place at 04: 15 AM) (Default)

Filter sign

 

Off (Deactivate)

: Do not automaticaly display .

On (Activate)

: Automaticaly display . (Default)

User set-up window

General operation set-up

Note:

When filter sign automatic display is deactivated, the filter status is not reflected automatically even when the filter sign window is selected. When the View filter button is clicked, the filter status is reflected.

To use the Schedule Set -up, it is necessary to register the license number of the annual/weekly schedule separately with the G-50A. When the license is not registered with the G-50A, it only possible to use the weekly schedule function of the G-50A. In this case, the schedule setting made from the integrated centralized control software TG-2000A is invalidated, resulting in operation failure.

23

Image 26
Contents Please read this manual before using the unit Please keep this manual for future useContents Page Do not use with other applications Safety PrecautionsOther machines ¡ *1 System Requirements Requirements system recommendationsCompatible Units Restrictions RestrictionsNumber of units Other Devices M e Manufacturer ModelSystem Configuration System Configuration Example Hardware Connection DiagramPC connections and settings Flow of Site AdjustmentTools for Site Adjustment 50A test runTest operation from centralized controller G-50A D e l s IP address rangePage Preparing for installation InstallationG-2000A Setup Steps Action Details How toDatabase setup Running TG-2000A Setup New setupMsde setup When the installation is completed, restart the computerTG-2000A setup completion Check the installation folderInstallation start confirmation Read the license agreementMsde uninstall G-2000A UninstallTG-2000A uninstall Part Names and Functions Window Elements Shift from the initial window to the control window Accessing Functions and Moving between WindowsBasic Mouse Operation Shift from the control window to the initial windowPage Page User Set -up Set TG -2000A functions Page Page Initial Startup and Shutdown Before Startup StartupShutting down the OS ShutdownTG-2000A Shutdown System Setting Procedure System Setting Screen System Setting ProcedureUser Set-up General OperationConnection Setting Reliability FunctionEnergy Monitoring Related Site Name Set-upPage Number of G-50A se t-up Step Setting Procedure and RestrictionsG-50 Connection Set-up IP address of G-50A se t-up StepSystem Configuration Set-up Monitor the optional functions being used. Procedure2 G-50A data collection Step Unit composition set-up StepChange the unit configuration. Procedure Icon Name Address rangeSe t-up of refrigerant system Step Set-up of group Step Interlocking ventilation unit Interlocked setting StepChange the group No. Procedure Interlocking destination un-set unitSet-up of model name Step Configuration Procedure and RestrictionsMonitoring Screen Set-up Set-up of the number of floors, and floor name Step Creation of a plane view Step Set-up of floor name and G -50Set the group icons on each floor and set their names Set-up of icon arrange and name StepFloor Selection Display Button Group ListSet-up of block Step Set the block groups. ProcedureDeleting block settings Name Change button Block Set button Release buttonChanging the block name Setting Procedures and Restrictions Check before WHM setup. ProcedureModel Baud rate Parity Stop bit Set Charge System options. Procedure Energy Monitoring S e t-upDivision mode for indoor unit Division mode StepDivision mode for outdoor unit Proportiona l division reference dataSelect the OC icon, and click on the selected outdoor unit Delete Watt Hour Meter RelationshipsDeleting Watt Hour Meter Relationships Relation between indoor units and watt hour meters StepSet the Indoor Unit and Watt Hour Meter Relationship Set the charge blocks. Procedure Charge Blocks StepAdd charge blocks Delete the charge blockRelease a block from charge blocks Exit the Currency Settings Selecting a Currency from the Display ProcedureManually Setting the Currency Set the electric power rate schedule. ProcedureSet the standard charge . Procedure 10Standard charge set StepTime Set-up Function ContentsSet the date/time . Procedure Monitor the time Monitor buttonPassword S e t-up Change the passwordNo repair is required Overview Remarks Maintenance Methods and Restrictions Maintenance of Charge DataPreparing for Charging Data Maintenance Display the Maintenance screen. ProcedureUnit Data Maintenance Maintaining Apportioned Unit DataCorrection method Maintenance example Watt Hour Meter Data Maintenance Maintaining watt hour Meter Data ProcedureDescription of function Watt hour Meter Monitor Function ProcedureOperation Amount Data Monitoring Monitor the data for the last day after Charge Parameter OutputMonitoring operation amount data Performing charging remedy Charging RemedyOutput file data format Preparing to perform charging remedy PreparationRemedial apportioning setting screen Apportioning integrated Remark InterValRemedial apportioning confirmation screen Calculating screen Remedy when personal computer HDD fails no backup Remedy when personal computer HDD fails backup Day before recovery day Apportioning method when computer crashes Remedy when watt hour meter fails monitoring impossible Integrate d Remedy for system information setting error Total air-conditioning charge including that Error Code List Air-conditioning unit error codesPage Page System error codes Detail of function Setting Check ListSetting item Case Test Run Check Test run check sheetLRC Date Tester Test item Comment Charging Test Run CheckCharging No WHM connection Test Run Check Page Capacity Check Within Outside Division mode Charge settingSetting TotalExample 1100 conditioner 1300 Outside Within 12001400 Page Page WHM1 WHM2 WHM3 WHM4 WHM5 WHM6 Memo Preparing for Se tup Appendix 1 Installing Windows XP ProfessionalSetup Procedure What you needPage Windows Appendix 2 Auto Log-in Confirmation MethodWindows XP Page WT03901X01