9.5.1 Preparing to perform charging remedy | |||
| accounts day | accounts term | accounts end day |
Remedial apportioning simply apportions the | entire |
|
|
|
|
|
| ||
|
|
|
|
|
| ||||
charge using the normal apportioning data. For remedial | Failure generation | Failure recovery | |||||||
apportioning, |
| ||||||||
|
| ê |
|
| ó |
| |||
• Settlement |
|
|
|
|
| ||||
| Normal | <Remedial a |
| Normal | |||||
• | Apportioning interval |
|
| ||||||
| pportioning interval> | ||||||||
• Total billing |
| Normal |
| Remedial |
| Normal | |||
• | Failure day watt hour meter integrated value |
|
| ||||||
apportioning + | apportioning | + apportioning | |||||||
|
|
|
•Operation data monitoring must be prepared or performed.
To perform the charging remedy, the items for each assumed case are shown below. V shows that the remedy is required.
|
|
| Assumed case |
|
| ||
|
|
|
|
|
|
|
|
| Item | att hour |
|
|
| System | Remarks |
| meter failure | HDD failure | HDD failure | Computer | |||
|
| information |
| ||||
|
| (Monitoring | (no backup) | (backup) | c r a s h |
| |
|
| setting error |
| ||||
|
| impos sible) |
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| V | V | V | V | V | Essential | |
| accounts term |
|
|
|
|
|
|
Preparation | R e m e d i a l | V | V | V | V | V | Essential |
apportioning |
|
|
|
|
|
| |
interval |
|
|
|
|
|
| |
|
|
|
|
|
|
| |
Total billing | V | V | V | V | V | *1 | |
a m o u n t |
|
|
|
|
|
| |
|
|
|
|
|
|
| |
| Wa tt hour meter | (V) | V |
|
|
|
|
| integrated value | *2 |
|
|
|
|
|
| for failure day |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Implementation | Operation amount |
| V | V | V |
| See sec . |
|
|
|
|
| 9.3 | ||
data monitoring |
|
|
|
|
| ||
|
|
|
|
|
| ||
|
|
|
|
|
|
| |
R e m e d i a l | V | V | V | V | V | See s e c . | |
|
|
|
|
| 9 .5 .2 | ||
apportioning |
|
|
|
|
| ||
|
|
|
|
|
| ||
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
*1 When there is one tariff, preparations are unnecessary.
*2 When replacing a watt hour meter, study the watt hour meter integrated value for the day the failure was thought to have occurred.
Note:
•This remedial apportioning simply calculates the
•When the s ettlement
•When the operation amount data must be monitored, do it before remedial apportioning.
•This function cannot be used for Without WHM connection proportionally divided electric charge.
63