Note:
•The initial integrated value is the interval for the previous month.
•When there is one electric power charge unit, the total
•[Include] standard charge can be selected only when the settlement
•Set the power integrated value only when necessary. The power integrated value initial value is the value stored in the database. When there is no data, a blank is displayed.
•When the recovery day exceeds the settlement
•See the execution examples for each assumed case starting from section 9. 5 . 3.
(3)Calculate remedial apportioning. [Procedure]
1)Click [OK] button.
When the necessary settings at the remedial appor- tioning setting screen are complete, click the [OK] button. The remedial apportioning confirmation screen appears.
2)Click [Yes] or [No] button.
Confirm remedial apportioning at the confirmation display screen, and click the [Yes] button. The [Calculating] screen appears.
Note:
•When the [OK] button in the remedial apportion- ing setting screen is clicked, the settings are checked for errors. If there is an error in the set contents, an alarm screen appears.
•Remedial apportioning calculation can be cancelled by clicking the [Cancel] button in the Calculating screen.
•Remedial calculation takes several minutes.
Remedial apportioning confirmation screen
Calculating screen
When there is an error in the remedial apportioning setting, a setting error warning message like that shown below is displayed.
Alarm display 1Alarm display 2
(4) Remedial apportioning calculated result display
At the end of remedial apportioning calculation, the remedial apportioning result screen appears.
Output button
Apportioning conditions |
|
display | Count save button |
| |
Remedial air |
|
charge display |
|
| Back button |
| End button |
| Remedial apportioning result screen |
65