Mitsubishi Electronics TG-2000A System Requirements Requirements system recommendations, ¡ *1

Page 5

2. System Requirements

2.1Requirements (system recommendations)

We recommend the following software and hardware when using this application (TG-2000A).

Item

Requirement

Recommended

 

 

 

PC

PC/AT interchangeable machine

Operation check completed, using IBM,

 

 

COMPAQ, and DELL

CPU

Pentium III 350 MHz or faster :

Pentium 4 1 . 8GHz or faster

 

within 1000 indoor units

 

 

Pentium III 1 GHz or faster :

 

 

1001 indoor units or over

 

Memory

128 MB or more

256 MB or more

 

 

 

HDD

6 GB or more (2GB or more of C drive free

4GB or more of C drive free space necessary

 

space necessary)

 

Storage device

FDD, CD-ROM drive

Devices other than those shown at the left may

 

 

a l s o b e i n s t a l l e d .

Resolution

1024 × 768 or higher, 65536 colors or more

 

 

 

 

Serial port

1 port or more

Required when using RS-485 communication WHM

LAN

Internal LAN (10/100 Mbps)

*1

OS

Windows XP Professional

English version only

 

Windows 2000 Professional

* Personal computer must support each OS.

 

Service Pack 2 and above

 

Other

Computer must be dedicated for this use (TG-2000A).

*1 Purchase the option, or use the equipment recommended for the personal computer when purchasing the personal computer.

2.2Compatible Units

The TG-2000A has two main functions: air conditioner controller and cost accounting. However, not all functions are available with all air conditioners.

Table: Compatible units and function list

(¡: supported, ￿: Certain restrictions apply, ×: Not supported)

Function

Control/

Charging (Billing)

 

Charging (Billing) with WHM

Model

Maintenance

without WHM

 

 

 

 

 

 

 

 

 

 

 

Y series

¡

 

¡ *1

Super Y series

¡

 

¡ *1

R2 series

¡

 

¡ *1

WR2 series

¡

 

¡ *1

WY series

¡

 

¡ *1

 

 

 

 

Multi S series

¡

 

¡ *1

 

 

 

 

Free plan Indoor unit

¡

 

¡ *1

Free plan LOSSNAY

¡

×

 

￿ (A separate watt hour meter is

 

 

 

 

required . Billing is done with

 

 

 

 

watt-hour units)

LOSSNAY with heating/

¡

×

 

￿ (A separate watt hour meter is

humidifying

 

 

 

required . Billing is done with

 

 

 

 

watt-hour units)

“A” control type

¡

×

 

￿ (A separate watt hour meter is

 

(Adapter required)

 

 

required . Billing is done with

 

 

 

 

watt-hour units)

“K” control type

¡

×

 

￿ (A separate watt hour meter is

 

(Converter required)

 

 

required . Billing is done with

 

 

 

 

watt-hour units)

*1 : Can be calculated for each charging block. May not be available with some older models.

2

Image 5
Contents Please keep this manual for future use Please read this manual before using the unitContents Page Do not use with other applications Safety PrecautionsOther machines ¡ *1 System Requirements Requirements system recommendationsCompatible Units Restrictions RestrictionsNumber of units M e Manufacturer Model Other DevicesHardware Connection Diagram System Configuration System Configuration ExampleTools for Site Adjustment Flow of Site AdjustmentPC connections and settings 50A test runD e l s IP address range Test operation from centralized controller G-50APage G-2000A Setup InstallationPreparing for installation Steps Action Details How toMsde setup Running TG-2000A Setup New setupDatabase setup When the installation is completed, restart the computerInstallation start confirmation Check the installation folderTG-2000A setup completion Read the license agreementMsde uninstall G-2000A UninstallTG-2000A uninstall Part Names and Functions Window Elements Basic Mouse Operation Accessing Functions and Moving between WindowsShift from the initial window to the control window Shift from the control window to the initial windowPage Page User Set -up Set TG -2000A functions Page Page Startup Initial Startup and Shutdown Before StartupShutting down the OS ShutdownTG-2000A Shutdown System Setting Procedure System Setting Procedure System Setting ScreenGeneral Operation User Set-upReliability Function Connection SettingSite Name Set-up Energy Monitoring RelatedPage G-50 Connection Set-up Setting Procedure and RestrictionsNumber of G-50A se t-up Step IP address of G-50A se t-up StepMonitor the optional functions being used. Procedure System Configuration Set-upUnit composition set-up Step 2 G-50A data collection StepIcon Name Address range Change the unit configuration. ProcedureSe t-up of refrigerant system Step Set-up of group Step Change the group No. Procedure Interlocked setting StepInterlocking ventilation unit Interlocking destination un-set unitSet-up of model name Step Configuration Procedure and RestrictionsMonitoring Screen Set-up Set-up of the number of floors, and floor name Step Set-up of floor name and G -50 Creation of a plane view StepFloor Selection Display Button Set-up of icon arrange and name StepSet the group icons on each floor and set their names Group ListDeleting block settings Set the block groups. ProcedureSet-up of block Step Name Change button Block Set button Release buttonChanging the block name Check before WHM setup. Procedure Setting Procedures and RestrictionsModel Baud rate Parity Stop bit Energy Monitoring S e t-up Set Charge System options. ProcedureDivision mode for outdoor unit Division mode StepDivision mode for indoor unit Proportiona l division reference dataDelete Watt Hour Meter Relationships Select the OC icon, and click on the selected outdoor unitDeleting Watt Hour Meter Relationships Relation between indoor units and watt hour meters StepSet the Indoor Unit and Watt Hour Meter Relationship Charge Blocks Step Set the charge blocks. ProcedureAdd charge blocks Delete the charge blockRelease a block from charge blocks Manually Setting the Currency Selecting a Currency from the Display ProcedureExit the Currency Settings Set the electric power rate schedule. Procedure10Standard charge set Step Set the standard charge . ProcedureTime Set-up Function ContentsSet the date/time . Procedure Monitor button Monitor the timeChange the password Password S e t-upNo repair is required Overview Remarks Preparing for Charging Data Maintenance Maintenance of Charge DataMaintenance Methods and Restrictions Display the Maintenance screen. ProcedureMaintaining Apportioned Unit Data Unit Data MaintenanceCorrection method Maintenance example Maintaining watt hour Meter Data Procedure Watt Hour Meter Data MaintenanceDescription of function Watt hour Meter Monitor Function ProcedureOperation Amount Data Monitoring Monitor the data for the last day after Charge Parameter OutputMonitoring operation amount data Performing charging remedy Charging RemedyOutput file data format Preparation Preparing to perform charging remedyApportioning integrated Remark InterVal Remedial apportioning setting screenRemedial apportioning confirmation screen Calculating screen Remedy when personal computer HDD fails no backup Remedy when personal computer HDD fails backup Day before recovery day Apportioning method when computer crashes Remedy when watt hour meter fails monitoring impossible Integrate d Remedy for system information setting error Total air-conditioning charge including that Air-conditioning unit error codes Error Code ListPage Page System error codes Detail of function Setting Check ListSetting item Case Test run check sheet Test Run CheckLRC Date Tester Test item Comment Charging Test Run CheckCharging No WHM connection Test Run Check Page Capacity Setting Division mode Charge settingCheck Within Outside TotalExample 1100 conditioner 1300 Outside Within 12001400 Page Page WHM1 WHM2 WHM3 WHM4 WHM5 WHM6 Memo Setup Procedure Appendix 1 Installing Windows XP ProfessionalPreparing for Se tup What you needPage Windows Appendix 2 Auto Log-in Confirmation MethodWindows XP Page WT03901X01