Installation
Installing the Hardware
Step 5: Observe the Power-On Sequence
nThe Gateway now goes through its
nThe green Power LED should now be illuminated and the red Fault LED should be off. One or more of the yellow LAN LEDs may also be flashing. Ignore the LAN LEDs at this time.
nThe red Fault LED is illuminated briefly at
nOnce you have verified that the hardware is working properly (the Gateway’s green Power LED is illuminated), disconnect the standard AC power cord from the power outlet (wall outlet).
Chapter 2 | 31 |