Appendix A. Installing the Battery Backup Unit

Installation Instructions

1For full-height controllers, turn the controller memory-side down on a flat surface.

2Remove the screws that connect the PCI bracket to the controller and set the bracket aside.

Half-height board: bracket unscrews from top side of board.

Full-height board: bracket unscrews from bottom side of board.

Figure 4. Removing the screws from the PCI bracket

3 For full-height controllers, turn the controller memory side up.

1023ware 9000 Series Serial ATA RAID Controller Installation Guide

Page 110
Image 110
AMCC 9000 manual Installation Instructions, Removing the screws from the PCI bracket