AMCC 9000 manual Battery power connector and power receptacle

Models: 9000

1 126
Download 126 pages 4.7 Kb
Page 113
Image 113

Installation Instructions

9Insert the battery power connector into the power receptacle on the BBU.

Figure 9. Battery power connector and power receptacle

The controller is now ready to install in your system. Figures 10 and 11 show the BBU fully installed on 3ware controllers.

You can check the status of the battery, and run a battery test to determine if the battery needs to be replaced. For details, see 3ware 9000 Series Serial ATA RAID Controller User Guide.

www.3ware.com

105

Page 113
Image 113
AMCC 9000 manual Battery power connector and power receptacle