Chapter 3

Installation

This section explains:

SEquipment inspection

SUnpacking the cabinet

SChecking the accessory kit

SCabinet installation (rackmount and tower)

SWiring installation

SInitial startup

ÊInspecting the Equipment

If any equipment has been damaged during shipment, keep the shipping cartons and packing materials for the carrier or place of purchase and file a claim for shipping damage. If you discover damage after acceptance, file a claim for concealed damage.

To file a claim for shipping damage or concealed damage: 1) File with the carrier within 15 days of receipt of the equipment; 2) Send a copy of the damage claim within 15 days to your service representative.

NOTE Check the battery recharge date on the shipping carton label. If the date has passed and the batteries were never recharged, do not use the UPS. Contact your service representative.

Eaton® 9130 UPS (700–3000 VA) User's Guide S 164201718 Rev 2 www.powerware.com

17

Page 25
Image 25
Eaton Electrical 9130 manual Chapter Installation, ÊInspecting the Equipment