INSTALLATION
ÊRackmount Installation
The Eaton 9130 rackmount cabinet comes with all of the hardware required for installation in a standard EIA or JIS seismic rackmount configuration with square and round mounting holes. The rail assemblies adjust to mount in
Checking the Rail Kit Accessories
Verify that the following rail kit items are included for each cabinet:
SLeft rail assembly:
-Left rail
-Rear rail
-(3) M4 8
SRight rail assembly:
-Right rail
-Rear rail
-(3) M4 8
SRail hardware kit:
-(10) M6 16
-(10) M6 cage nuts
-(2) rear stop brackets
-(2) M3 8
SMounting bracket kit:
-(2) mounting brackets
-(8) M4 8
Tools Required
To assemble the components, the following tools may be needed:
SMedium
SPhillips® #2 screwdriver
S7 and 8 mm wrench or socket
Eaton® 9130 UPS | 19 |