INSTALLATION

Connecting the EBM(s)

To install the optional EBM(s) for a UPS:

1.On the bottom of the UPS right front cover, remove the EBM cable knockout (see Figure 11).

NOTE Use care to protect the LCD control panel and the connected ribbon cable from damage.

esc

Knockout for EBM Cable

Figure 11. Removing the EBM Cable Knockout

2.Remove the front cover of each EBM (see Figure 12).

To remove the cover, remove and retain the two screws on the right side of the cover. Grasp the sides of the cover and slide the cover to the left and then away from the cabinet.

26

Eaton® 9130 UPS (700–3000 VA) User's Guide S 164201718 Rev 2 www.powerware.com

Page 34
Image 34
Eaton Electrical 9130 manual Connecting the EBMs, Removing the EBM Cable Knockout