Site Preparation
●Meeting power requirements
To run your equipment safely, you must meet the specific power requirements for each power supply unit installed in the system. For power supply specifications, see “Power Supplies for the BlackDiamond 12800 Series Switches” on page 151.
Meeting Site Requirements
This section addresses the various requirements to consider when preparing your installation site, including:
●Operating Environment Requirements
●Rack Specifications and Recommendations
Operating Environment Requirements
Verify that your site meets all environmental and safety requirements.
Virtually all areas of the United States are regulated by building codes and standards. During the early planning stages of installing or modifying your LAN, it is important that you develop a thorough understanding of the regulations that pertain to your location and industry.
Building and Electrical Codes
Building and electrical codes vary depending on your location. Comply with all code specifications when planning your site and installing cable. The following sections are provided as a resource to obtain additional information.
Information about major building codes is located at the following websites:
●International Code Council (ICC); 5203 Leesburg Pike; Falls Church, Virginia 22041 USA. http://www.iccsafe.org
http://www.sbcci.org
Five authorities on electrical codes are:
●National Electrical Code (NEC) Classification (USA
●Underwriters’ Laboratory (UL) (USA
●National Electrical Manufacturing Association (NEMA) (USA
●Electronics Industries Alliance