Repacking a BlackDiamond Chassis
Repacking the BlackDiamond 12804 Chassis
To repack the BlackDiamond 12804 chassis:
1Remove all modules and power supplies from the BlackDiamond 12804 chassis. Follow correct Extreme Networks procedures for removing components.
2Using four rack mounting screws, attach the
3Remove the eight rack mounting screws that secure the chassis to the system rack.
4On each side of the chassis, place one hand in the empty power supply bay and the other hand in the rear slot on the back panel of the chassis.
CAUTION
Do not use the fan tray handle to lift or maneuver the BlackDiamond 12804 chassis. This handle is not designed to support the weight of the chassis.
5Slowly guide the chassis out of the system rack using the helper bracket for support.
6Carefully lift the chassis off the helper bracket and lower it onto the foam cushion in the shipping carton base (see Figure 81.)
Figure 81: Setting the BlackDiamond 12804 Chassis onto the Foam Cushion
EX_129
126 | BlackDiamond 12800 Series Switches Hardware Installation Guide |
|
|