Unpacking the BlackDiamond 12802 Chassis

Figure 33: Unpacking the BlackDiamond 12802 Chassis

BlackDiamond documentation pack with ESD-preventive wrist strap

BlackDiamond 12802 switch

Rack-mount brackets and hardware

BD_149

5To lift the BlackDiamond chassis, on each side have one person support the bottom of the chassis as you lift the chassis off the bottom foam cushion.

CAUTION

Do not lift the chassis using the top of the front opening. The weight of the chassis may cause the enclosure to deform.

Set the chassis on a secure, flat work surface.

6Break the inspection seal on the packing bag and remove the chassis from the bag.

NOTE

Save the box and all packaging for future use in case the BlackDiamond 12802 chassis must be returned to Extreme Networks, Inc.

BlackDiamond 12800 Series Switches Hardware Installation Guide

65

 

 

Page 65
Image 65
Extreme Networks 12800 Series manual Unpacking the BlackDiamond 12802 Chassis