4)After each cable connector is connected, secure the cable so that the cable does not touch the drive or the parts on the PCA or obstruct the flow of cooling air in the system cabinet.

1)Be careful of the insertion directions of SCSI connectors. For a system in which the terminating resistor power is supplied via the SCSI cable, connecting connectors in the wrong direction may cause the following:

The overcurrent protection fuse of the terminating resistor power supply (SCSI device) may blow when power is turned on.

The cable may burn if overcurrent protection is not provided.

2)Be careful of cable connector positions when connecting more than one SCSI device. The SCSI device having the terminating resistor must be connected to the end of the cable.

3)The cables must be kept away from the rotating part of the spindle motor.

4.6Operation Confirmation and Preparation for Use after Installation

4.6.1 Confirming initial operations

This section provides the operation check procedures after the power is turned on.

(1) Initial operation when the power is turned on

When the power is turned on, the drive starts initial self-diagnosis. The LED on the front panel is on for 1 second during initial self-diagnosis.

If an error is detected during initial self-diagnosis, the LED on the front panel blinks.

In case of not inserted the cartridge, when the power is turned on, the eject motor automatically turns once.

(2) Checks if errors occur at initial self-diagnosis

Make sure that the cables are connected correctly.

Make sure that the supply voltage is correct. (Measure the voltage at the power supply connector of the optical drive.)

Make sure that the settings of all terminals are correct.

If the LED on the front panel blinks continuously, an error was detected during initial self-diagnosis. In this case, issue the REQUEST SENSE command from the initiator (host system) to obtain sense data for error analysis.

4-14

C156-E228-02EN

Page 80
Image 80
Fujitsu MCP3064SS, MCM3064SS, MCP3130SS, MCM3130SS manual Confirming initial operations