2

INSTALLATION

Overview

Procedure 1: Prepare to Install the Hub

Procedure 2: Unpack the Hub

Procedure 3: Verify Hub Operation

Procedure 4: Mount the Hub into a Rack (Optional)

Procedure 5: Plan the FC-AL Connections

Procedure 6: Connect FC-AL Devices

Procedure 7: Verify the Connections

Installation

21