Procedure 1: Prepare to Install the Hub
Before installing the hub:
•Complete
•Make sure electrical power and temperature control requirements are met.
•Define a strategy for integrating the hub into an existing loop.
•Draw a map of all nodes to be connected to the hub.
Installation
Procedure 1: Prepare to Install the Hub | 23 |