Chapter 6

Replacing Parts

Replacing the NetRAID Battery Backup Module (Optional)

System

Backplane

Unplug cable

Battery Backup Module (BBM)

Battery Backup Module Location

The installation procedure is the same for the rack-mount and the pedestal HP NetServers once you gain access to the I/O side of the chassis.

1.Log off all users and gracefully shut down the network operating system according to directions in your NOS documentation.

2.Power down the HP NetServer.

3.Disconnect the power cords and cables, and if necessary, label each one to support re- assembly.

CAUTION The power supplies will continue to provide standby current to the NetServer until the power cable is disconnected.

4. For both rack-mounted and pedestal models, gain access to the I/O side of the chassis.

NOTE

In the rack-mounted version, the I/O is under the top cover, in the pedestal version,

 

the I/O is under the left cover.

WARNING Always disconnect the power cords before removing the covers, to avoid exposure to high energy levels that may cause burns when parts are short-circuited by metal objects such as tools or jewelry. Disconnect any telephone cables to avoid exposure to shock hazard from telephone ringing voltages.

5. Unplug the cable from the I/O board.

84

Page 90
Image 90
HP LH 6000 Replacing the NetRAID Battery Backup Module Optional, System Backplane Unplug cable Battery Backup Module BBM