III Configuration quick starts

89

9 Quick Start: Initial Configuration

91

9.1 Process overview

91

9.2 Configure the environment for the first time

91

10 Quick Start: Adding a network to an existing appliance environment

95

11 Quick Start: Adding an enclosure and connecting its server blades to

 

networks

99

11.1 Checklist: connecting a server blade to a data center network

99

11.2 Scenario 1: Adding the enclosure to an existing enclosure group

100

11.3 Scenario 2: Defining network connectivity before the enclosure is added

101

11.4 Scenario 3: Defining network connectivity as you add the enclosure

102

12 Quick Start: Configuring an enclosure and server blade for Direct attach to

an HP 3PAR Storage System

105

13 Quick Start: Adding an HP ProLiant DL rack mount server

107

IV Configuration and management

109

14 Managing servers and server profiles

111

14.1 Server hardware features supported by the appliance

111

14.2 Prerequisites for bringing server hardware under management

112

14.3 Roles

112

14.4 Tasks for server profiles

112

14.5 Tasks for server hardware

113

14.6 Tasks for server hardware types

113

14.7 Effects of managing server hardware iLOs

113

14.8 Learning more

114

15 Managing networks and network resources

115

15.1 Data center switch port requirements

115

15.2 Managing Fibre Channel networks (SANs)

115

15.2.1 Roles

116

15.2.2 Tasks

116

15.3 Managing Ethernet networks

116

15.3.1 Roles

116

15.3.2 Tasks

116

15.4 About network connectivity

116

15.4.1 About Fibre Channel networks

117

15.4.1.1 Fibre Channel network types

117

15.4.1.2 Fabric attach Fibre Channel networks

118

15.4.1.3 Direct attach Fibre Channel networks

118

15.4.1.4 Fibre Channel networks and FCoE

119

15.4.2 About Ethernet networks

119

15.4.2.1 Ethernet networks and VLAN IDs

119

6Contents

Page 6
Image 6
HP OneView manual An HP 3PAR Storage System 105, 107, Managing networks and network resources 115