40 MAINTENANCE

40 MAINTENANCE

SSR UP Series Maintenance Schedule

PERIOD

MAINTENANCE

 

 

Each 24 hours

Check the coolant level and replenish if

operation

necessary.

Visual check of

Report immediately, contact Ingersoll Rand

machine for any

authorized distributor for assistance if in

leaks, dust build up

doubt

or unusual noise or

 

vibration

 

When compressor

Drain air receiver of condensate, or check

is receiver mounted

that automatic drain is operating

 

 

Visual check

Blow clean if needed

condition of

 

package pre–filter

 

 

 

If the air filter

Check the Condition of filter. Change the air

indicator locks into

filter if needed. Dusty environments require

red position before

more frequent replacement.

the 2000 hour/1 year

(Indicator should be checked with unit

change out period

stopped)

 

 

First 150 hours

Change the coolant filter.

 

 

Each month or 100

Remove and clean package pre–filter,

hours

replace if needed

 

Check the cooler(s) for build up of foreign

 

matter. Clean if necessary by blowing out

 

with air or by pressure washing.

 

Check hoses and fittings for leaks – tighten

 

as required.

 

 

Each 2000 hours / 6

Take coolant sample for fluid analysis.

months

Check scavenge screen for blockage, clean

 

 

if required.

 

 

Each year or

Change the coolant filter.

2000 hours

 

 

 

 

Change the separator cartridges.

 

Change the package pre–filter.

 

Visual Check of Drive Belt and tensioning

 

gas spring.

 

 

 

Take Coolant sample for Fluid Analysis

 

Change the Air Filter element.

 

Check inlet valve flapper – re–condition as

 

needed.

 

Check refrigerant compressor oil level.

 

 

Pressure vessel

Separator vessel and air receiver when

inspection

fitted.

frequency may be

Fully inspect all external surfaces, and

otherwise defined

fittings. Report any excessive corrosion,

by local or national

mechanical or impact damage, leakage or

legislation.

other deterioration.

 

 

Every two years or

Change drive belt and gas spring.

8000 hours

Replace the Ultra Coolant at whichever

 

 

interval occurs first.

 

Check and replace all items included within

 

2000 hour service

 

Fit the following reconditioning parts as

 

appropriate:

 

Solenoid valves

 

Inlet valve kit

 

Minimum Pressure valve insert

 

Thermostatic Valve actuator

 

 

 

Strip, clean and re–Grease motor bearings

 

of ODP motors.

 

 

Every 4 years or

Replace all hoses.

16000 hours

Strip, clean and re–Grease motor bearings

 

 

of ODP motors.

 

Replace sealed bearing on IP55 motors.

 

 

Fit replacement electrical contactor tips.

 

 

6 years/16000 hours

Separator tank.

or as defined by

Remove the cover plate and any necessary

local or national

fittings. Clean the interior thoroughly and

legislation.

inspect all internal surfaces.

 

 

ROUTINE MAINTENANCE

This section refers to the various components which require periodic maintenance and replacement.

. It should be noted that the intervals between service requirement may be significantly reduced as a consequence of poor operating environment. This would include effects of atmospheric contamination and extremes of temperature.

The SERVICE/MAINTENANCE CHART indicates the various components’ descriptions and the intervals when maintenance has to take place. Oil capacities, etc., can be found in the GENERAL INFORMATION section of this manual.

Compressed air can be dangerous if incorrectly handled. Before doing any work on the unit, ensure that all pressure is vented from the system and that the machine cannot be started accidentally.

CAUTION: Before beginning any work on the compressor, open, lock and tag the main electrical disconnect and close the isolation valve on the compressor discharge. Vent pressure from the unit by slowly unscrewing the coolant fill cap one turn. Unscrewing the fill cap opens a vent hole, drilled in the cap, allowing pressure to release to atmosphere. Do not remove the fill cap until all pressure has vented from the unit. Also vent piping by slightly opening the drain valve. When opening the drain valve or the coolant fill cap, stand clear of the valve discharge and wear appropriate eye protection.

Ensure that maintenance personnel are properly trained, competent and have read the Maintenance Manuals.

Prior to attempting any maintenance work, ensure that:–

. all air pressure is fully discharged and isolated from the system. If the automatic blowdown valve is used for this purpose, then allow enough time for it to complete the operation.

. the machine cannot be started accidently or otherwise.

. all residual electrical power sources (mains and battery) are isolated.

Prior to opening or removing panels or covers to work inside a machine, ensure that:–

. anyone entering the machine is aware of the reduced level of protection and the additional hazards, including hot surfaces and intermittently moving parts.

SSR UP6 40, SSR UP6 50PE, SSR UP6 50PEI, HF50–PE, EP50–PE,

http://air.ingersollrand.com

HP50–PE, HXP50–PE

 

Page 42
Image 42
Ingersoll-Rand SSR UP6 40 SSR UP Series Maintenance Schedule, Period, hours, Separator vessel and air receiver when