Operating Procedures
6.2UPS Startup
The NX must be fully installed and commissioned before startup, and external power isolators must be closed. Once those general conditions are met, the UPS may be started.
6.2.1Start-Up Procedure
To start the UPS from a fully
1. Open the UPS door to gain access to the main power switches.
!WARNING
During this procedure the output terminals will become live.
If any load equipment is connected to the UPS output terminals, please check with the load user and ascertain whether it is safe to apply power to the load. If the load is not ready to receive power, then ensure that it is safely isolated from the UPS output terminals.
!CAUTION
Do not operate the rotary switch too fast. Always wait at least 30 seconds when rotating the switch from one position to another
2.Close CB1.
3.Turn the rotary switch to TEST.
The bypass static SCR (M2) closes automatically and the LCD begins to show
Because output switch
Indicator | State |
Rectifier indicator | Off |
Battery indicator | Off |
Bypass indicator | Off |
Inverter indicator | Off |
Load indicator | Off |
Status indicator | Off |
! WARNING
Do NOT turn the rotary switch until the rectifier indicator stops flashing green. 4. Turn the rotary switch to BYPASS.
Indicator | State |
Rectifier indicator | Green |
Battery indicator | Off |
Bypass indicator | Green |
Inverter indicator | Off |
Load indicator | Green |
Status indicator | Amber |
The maintenance switch
46