Leveling the Ice Storage Bin

Installation Instructions

Section 2

 

 

Leveling the Ice Storage Bin

1.Screw the leveling legs onto the bottom of the bin.

2.Screw the foot of each leg in as far as possible.

!Caution

The legs must be screwed in tightly to prevent them from bending.

3.Move the bin into its final position.

4.Level the bin to assure that the bin door closes and seals properly. Use a level on top of the bin. Turn each foot as necessary to level the bin.

NOTE: An optional caster assembly is available for use in place of the legs. Installation instructions are supplied with the casters.

THREAD LEVELING

LEG INTO BASE OF

CABINET

THREAD ‘FOOT’ IN AS

FAR AS POSSIBLE

SV1606

Condenser Air Baffle

(QC700/QF800 Air-Cooled Ice Machines Only)

The air-cooled baffle prevents condenser air from recirculating. To install:

1.Remove the back panel screws next to the condenser.

2.Align the mounting holes in the air baffle with the screw holes and reinstall the screws.

AIR

BAFFLE

SCREWS

SV1607

Air Baffle

Leveling Leg and Foot

2-4

Revised 8/2003

Part No. 80-1214-3

 

 

Page 16
Image 16
Manitowoc Ice QF0800, QF2300, QC0700 Installation Instructions, Section, Leveling the Ice Storage Bin, Condenser Air Baffle