Section 2 | Installation Instructions |
|
|
Suction Shut Off Valve Insulation
The
A.Verify valve and schrader caps are tightened to specifications (see Step 6).
INSULATION
TIGHTEN VALVE CAPS TO | SV3084 |
SPECIFICATIONS |
B.Place insulation over schrader valve cap and left side of valve. Position the tab between the mounting bracket and rear panel.
PLACE TAB BETWEEN
VALVE BODY AND PANEL
SV3085
C.Fold insulation and hold against right hand side of valve while securing with electrical tape. Seal the line set insulation to the shut off valve insulation with electrical tape.
FOLD INSULATION OVER
RIGHT SIDE OF VALVE AND
SECURE WITH
ELECTRICAL TAPE
SV3086
Part No. | Revised 8/2003 |
|
|
|