Electrical System | Section 6 |
|
|
QF2300
Automatic
3B. WATER DRAIN
To allow water to drain from the evaporator, the dump valve energizes for 90 seconds, then
An 8 minute lockout starts when the compressor
L1 | GROUND |
| C1 | C2 | L2 |
|
|
| |||
|
|
|
| ||
|
|
|
| LIQUID LINE |
|
|
|
| (54) | SOLENOID |
|
| RELAY |
| (53) | ||
| (91) |
|
|
| |
| K2 |
| EQUALIZATION |
| |
|
|
| (58) | SOLENOID | (57) |
|
| RELAY |
| ||
|
|
|
|
| |
| (25) | K1 |
|
|
|
|
|
|
|
| |
| 7 AMP |
| CENTRIFUGAL | (22) | |
|
|
| SWITCH | ||
| FUSE |
| INTERNAL |
|
|
|
| (65) | OVERLOAD | START |
|
|
|
|
|
| |
|
| RELAY |
| RUN |
|
| RELAY K4 |
|
|
| |
| K3 |
|
|
| |
|
| GEARMOTOR |
| ||
|
|
|
| ||
|
| WATER FLOAT |
|
| |
| (52) | VALVE | (56) |
|
|
|
|
|
| ||
| (22) |
|
|
|
|
|
|
| (55) |
|
|
| (51) |
|
|
|
|
DUMP VALVE
|
| SV2112 |
|
| 3B. Water Drain (90 Seconds) |
Toggle Switch | ICE | |
Bin Level Probe | CLOSED ( Ice Contacting probe) | |
Control Board Relays |
| |
#1 | Liquid Line Solenoid Valve | OFF |
#2 | Dump Valve | ON |
#3 | Gear Motor | OFF |
#$ | Water Float Valve Solenoid Coil | OFF |
| Revised 8/2003 | Part No. |
|
|